Bathroom remodelers in Aurora, CO

Aurora, Colorado spans three counties and a huge range of housing stock, from 1950s ranch homes near the Original Aurora Historic District to new-build primary suites out toward Southlands, so bathroom remodel costs and permit needs vary a lot block to block. This guide covers what a cosmetic refresh, full remodel, or curbless shower actually costs in the Aurora market, what the City of Aurora Building Division requires before you start, and how Colorado's trade licensing works for the plumbers and electricians who will touch your project.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Aurora bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 bathroom remodelers in Aurora, CO

The 10 Aurora bathroom remodelers with the most Google reviews.

  1. 1

    A Flores Construction LLC

    5.0104 reviews23834 E 36th Pl, Aurora, CO 80019, USA

    View on Google
  2. 2

    Richlynn Construction And Remodeling

    4.992 reviews10233 S Parker Rd Ste 300, Parker, CO 80134, USA

    View on Google
  3. 3

    BusyBee Bathroom Remodeling & Kitchen

    5.044 reviews13 E Galena Blvd, Aurora, IL 60506, USA

    View on Google
  4. 4

    Kissel's Bath and Kitchen

    4.940 reviews16797 E 2nd Ave, Aurora, CO 80011, USA

    View on Google
  5. 5

    Hire a Handyman

    4.934 reviews565 Nucla Way, Aurora, CO 80011, USA

    View on Google
  6. 6

    Elegant Home Remodeling Co.

    5.029 reviews15938 E 106th Pl, Commerce City, CO 80022, USA

    View on Google
  7. 7

    HH Remodeling llc

    5.024 reviews21990 E Irish Dr, Aurora, CO 80016, USA

    View on Google
  8. 8

    Romo's Kitchen & Bath Remodeling LLC

    4.824 reviews4739 S Pagosa Way, Aurora, CO 80015, USA

    View on Google
  9. 9

    BAB Construction LLC

    5.020 reviews12870 E Idaho Dr, Aurora, CO 80012, USA

    View on Google
  10. 10

    Bathroom Remodeling Aurora Squad

    5.016 reviews14707 E 2nd Ave, Aurora, CO 80011, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Aurora bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every bathroom remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope, allowances and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Aurora bathroom remodelers

  1. Step 1

    Tell Henry about your bathroom

    Your ZIP, the kind of remodel (refresh, full gut, tub-to-shower) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard bathroom remodelers in your Aurora-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three bathroom remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What bathroom remodeling costs in Aurora

Cosmetic refresh (paint, fixtures, vanity swap, no layout change)$4,500–$10,000
Mid-range full remodel (new tub/shower, tile, vanity, flooring)$13,000–$26,000
Upscale/primary bath remodel (custom tile, double vanity, freestanding tub)$28,000–$55,000+
Tub-to-shower conversion$5,500–$13,000
Walk-in/curbless shower (including waterproofing and linear drain)$9,000–$20,000

Ranges are general estimates gathered from homeowner-reported quotes in the Aurora area, not an offer or a quote for your project.

When to schedule bathroom remodeling in Aurora

Aurora's dry, high-altitude climate and wide temperature swings mean most remodeling contractors stay booked through late spring and summer, so winter and early spring tend to have shorter lead times for demo and tile crews. Because the Front Range gets very little humidity most of the year, bathrooms are less prone to mold between projects, but that also means homeowners sometimes skip ventilation upgrades they shouldn't; any remodel that changes a shower or tub is a good time to confirm the exhaust fan is sized and ducted to the exterior per code. Materials like natural stone and grout can take slightly longer to cure properly in winter if a house is kept cool, so some installers build in extra cure time for showers finished between November and March.

Permits and HOA rules

The City of Aurora Building Division, part of Public Works, issues permits and performs plan review and inspections for remodeling work inside city limits; reach the Permit Center at 303-739-7420 or permitcounter@auroragov.org, or apply online through Aurora4Biz.org. A bathroom remodel that relocates plumbing fixtures, adds or moves electrical circuits, alters framing, or changes the footprint of the room typically requires a building permit with separate plumbing and electrical permits as applicable; straightforward like-for-like fixture replacement without moving supply or drain lines may fall under work exempt from permit, but confirm your specific scope with the Permit Center before starting, since that determination is made case by case. Aurora has also adopted its own amendments to the state-adopted building and electrical codes, including a transition to the 2026 National Electrical Code with an effective date of August 1, 2026, so any new electrical permit applications are reviewed against current code requirements at the time of application. If your home sits within the Original Aurora Historic District or another designated historic area, check with Aurora's Planning and Development Services about any additional review before exterior or structural changes, even though most bathroom interiors are not affected by historic design review. Never assume a specific permit fee; the Permit Center publishes current fee schedules and will quote your project directly.

Licensing and insurance in Colorado

The City of Aurora requires its own contractor licensing for work performed inside city limits, separate from any county or state registration, and licenses and renewals are managed through Aurora4Biz.org under the Building Division's contractor licensing program; ask any contractor you're considering for their current City of Aurora license number and verify it with the Permit Center before signing a contract. Colorado does not issue a single statewide general contractor license, so general remodeling contractors are typically licensed at the city or county level instead. Plumbing work, however, is licensed at the state level by the Colorado State Plumbing Board, part of the Division of Professions and Occupations (DORA), which issues residential, journeyman, and master plumber licenses and can be verified through DORA's online licensee lookup. Electrical work is likewise licensed at the state level by the Colorado State Electrical Board under DORA, which issues residential wireman, journeyman, and master electrician licenses. Any contractor pulling plumbing or electrical permits for your bathroom remodel in Aurora should be able to show an active state license in that trade in addition to any required city registration.

What drives bathroom remodel costs in Aurora

The single biggest cost swing in any Aurora bathroom remodel is whether plumbing fixtures stay in their existing locations or move. Keeping the toilet, tub, and sink on their current supply and drain lines keeps a project in the cosmetic-to-mid-range tier, while relocating a shower to the opposite wall or adding a second sink means opening walls and floors, rerouting supply lines, and often repouring or cutting into the slab or subfloor, which can add thousands of dollars before a single tile goes up.

Home age matters too. Many homes in Original Aurora and the older sections near Fletcher date to the 1950s and 1960s and may still have galvanized supply lines or outdated electrical that a plumber or electrician will flag once walls are opened, even if the original remodel scope didn't plan for it. Newer construction out toward Southlands and Saddle Rock tends to have more current rough-in work, which usually means fewer surprise repairs but doesn't necessarily lower material or labor costs for a high-end finish package.

Material allowances are where most homeowners either stay on budget or blow past it. A tile allowance of $4 to $8 per square foot reads very differently than a $15-per-square-foot porcelain slab or natural stone selection, and the same spread applies to vanities, countertops, and plumbing fixtures. Ask your contractor to write specific dollar allowances into the contract for tile, vanity, countertop, faucet set, and lighting, rather than vague line items like 'tile allowance' with no number attached.

Cosmetic refresh vs. full remodel vs. upscale primary bath

A cosmetic refresh in Aurora generally means a new vanity, toilet, faucet, light fixture, paint, and maybe a reglazed or refinished tub, all without moving plumbing or opening walls. This is the fastest tier, often completed in a few days to a week, and the lowest risk for hidden costs because the scope stays visible from the start.

A mid-range full remodel replaces the tub or shower, retiles the floor and wet walls, swaps the vanity and countertop, and often updates lighting and ventilation, while keeping fixtures in roughly the same footprint. This is the most common scope homeowners ask Henry's network of local pros to quote, and it's where having three separate written bids matters most, since labor approaches and material markups vary widely between contractors for the same scope.

An upscale or primary bath remodel typically includes a curbless or oversized shower with a linear drain, a freestanding or built-in soaking tub, double vanity, heated floor, and custom tile work, sometimes paired with a layout change to enlarge the room by borrowing space from an adjacent closet. These projects commonly take four to eight weeks and involve the most coordination between tile setters, plumbers, electricians, and sometimes a structural contractor if a wall is load-bearing.

Tub-to-shower conversions and curbless showers

Tub-to-shower conversions are popular in Aurora among homeowners aging in place or simply wanting a more usable daily shower, and pricing depends heavily on whether the existing drain location works for the new shower pan or whether the drain needs to move, which requires breaking into the slab on a single-story home or cutting the subfloor on a second story.

Waterproofing method is the detail that determines how long a shower lasts. A sheet-membrane or liquid-applied waterproofing system behind the tile, properly sloped to the drain, costs more upfront than a traditional mortar-bed-only approach but prevents the slow leaks that eventually rot subfloor and framing. Ask any contractor bidding your project exactly which waterproofing system they use and whether it's rated for the tile and drain combination you've chosen.

Curbless and walk-in showers remove the entry threshold entirely, which requires either lowering the subfloor in that section of the room or building up the surrounding floor, plus a linear or center drain set at the correct slope. This is a precision framing and plumbing task, and it's worth confirming your contractor has built curbless showers before, since an incorrect slope is one of the most common and expensive mistakes to fix after tile is set.

Plumbing moves: the real cost driver

Moving a toilet even a few feet can require relocating the drain's connection to the main waste stack, which on a slab-on-grade home in neighborhoods like Murphy Creek or Tollgate Crossing means jackhammering concrete, running new cast iron or PVC, and repouring before any finish work starts. On a home with a basement or crawlspace, the same move is usually cheaper because the plumber can access the lines from below without breaking the floor.

Adding a second sink or converting a single-sink vanity to a double often means running a new branch supply and drain line, which is straightforward in an open wall cavity but gets more expensive if the wall is load-bearing or shared with a tiled shower on the other side.

Electrical moves add their own cost layer. Adding a GFCI-protected outlet near a new vanity location, relocating a light switch, or adding a dedicated circuit for a heated floor or exhaust fan with a humidity sensor all require a licensed electrician and typically a separate electrical permit in Aurora. Bundling these changes into the original scope, rather than discovering them mid-project, keeps the schedule and the budget predictable.

Payment schedules and protecting yourself during the project

A fair milestone payment schedule for an Aurora bathroom remodel typically ties payments to completed phases: a modest deposit to schedule the work and order materials, a payment after demo and rough-in plumbing and electrical pass inspection, another after tile and waterproofing are complete, and a final payment after punch-list items are finished and the homeowner has walked through the space. Paying the bulk of the contract price upfront removes your leverage if problems come up later.

Every change order, whether it's an upgraded tile selection or an unexpected plumbing repair discovered after demo, should be documented in writing with the added cost and any schedule impact before the work proceeds. Henry's model for connecting homeowners with local pros is built around this: the three contractors who respond to a request agree to show up for the estimate, put their pricing in writing, and finish the work they quoted, rather than verbal promises that change once the project is underway.

Keep a copy of the permit and any inspection results for your records, and don't pay a final invoice until you've confirmed the required inspections passed. If your contractor says a permit 'isn't needed' for work that clearly involves moving plumbing or adding electrical circuits, call the City of Aurora Permit Center yourself to confirm before work starts.

Choosing a contractor in the Aurora market

Aurora's size and the variety of its housing stock mean contractors often specialize by era of home or by project scope; a contractor who regularly works on 1960s ranch homes near Del Mar Circle may have more relevant experience with galvanized pipe and plaster walls than one who mostly builds out new-construction primary suites in Southlands. Ask directly about recent projects similar in age and scope to your home.

Verify that any contractor pulling permits in Aurora holds current City of Aurora contractor licensing, and separately confirm that the plumber and electrician on the job hold active Colorado state licenses through DORA's online license lookup. These are two different checks, and a general remodeling contractor's city license does not substitute for a plumber's or electrician's state license.

Get written quotes from at least three local pros so you can compare not just the bottom-line price but how each contractor breaks down labor, material allowances, and the payment schedule. A quote that's vague about tile allowance, waterproofing method, or who's pulling permits is harder to hold anyone accountable to later.

Timeline expectations for Aurora bathroom remodels

A cosmetic refresh usually runs three to seven working days once materials are on-site. A mid-range full remodel that keeps the existing layout typically takes two to four weeks, including demo, rough-in inspection, tile, and finish work, though lead times for custom vanities or special-order tile can extend that by several weeks before work even starts.

Upscale remodels or any project involving a layout change, moved plumbing, or structural work should be budgeted at four to eight weeks of active construction, plus however long the City of Aurora's plan review and permit issuance takes for your specific scope. Scheduling inspections promptly after rough-in, rather than batching several trades' work before calling for inspection, tends to keep projects moving instead of stalling for a week while waiting on a city inspector.

Areas Henry covers

Original Aurora (Fletcher) · Lowry (Aurora portion) · Southlands · Saddle Rock · Heather Gardens · Tollgate Crossing · Murphy Creek · Meadow Hills

Common questions

Does a bathroom remodel in Aurora always require a permit?

Not always. Simple like-for-like fixture replacement that doesn't move plumbing or add electrical circuits may be exempt, but any work that relocates fixtures, changes framing, or adds electrical typically needs a permit. Confirm your specific scope with the City of Aurora Permit Center at 303-739-7420 before starting.

How much does a mid-range bathroom remodel cost in Aurora, CO?

A mid-range full remodel that keeps the existing layout but replaces the tub or shower, tile, vanity, and flooring generally runs $13,000 to $26,000, depending on material selections and whether any plumbing needs to move. Get written quotes from three local pros to compare for your specific home.

Does Colorado require a state general contractor license?

No. Colorado does not issue a statewide general contractor license; contractors are generally licensed at the city or county level instead. The City of Aurora requires its own contractor licensing for work inside city limits, separate from any county registration.

Who licenses plumbers and electricians for a bathroom remodel in Aurora?

Plumbers are licensed by the Colorado State Plumbing Board and electricians by the Colorado State Electrical Board, both under the Division of Professions and Occupations (DORA). You can verify an active license through DORA's online licensee lookup before work begins.

Are there historic district rules that affect bathroom remodels in Aurora?

Homes within the Original Aurora Historic District or other designated historic areas may face additional design review for exterior or structural changes, though most interior bathroom remodels aren't affected. Check with Aurora's Planning and Development Services if your home is in a designated historic area.

What's the cheapest way to update a bathroom without a full remodel?

A cosmetic refresh, swapping the vanity, toilet, faucet, lighting, and paint while keeping existing plumbing locations, typically runs $4,500 to $10,000 and avoids the cost and permitting complexity of moving fixtures or opening walls.

How long does a bathroom remodel take in Aurora?

A cosmetic refresh takes about three to seven working days. A mid-range full remodel usually takes two to four weeks of active work, while an upscale remodel with layout changes or moved plumbing typically takes four to eight weeks, plus permit review time.

Sources

Get Aurora bathroom remodel estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Bathroom Quotes