Bathroom remodelers in Washington, DC

A Navy Yard condo bathroom and a Capitol Hill rowhouse bathroom involve different access and approval questions. Compare realistic planning ranges and define the plumbing, waterproofing and fixture scope before requesting written bathroom remodel bids in Washington.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Washington bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 bathroom remodelers in Washington, DC

The 10 Washington bathroom remodelers with the most Google reviews.

  1. 1

    Elegant Kitchen and Bath

    5.0378 reviews2445 Centreville Rd suite 46, Herndon, VA 20171, USA

    View on Google
  2. 2

    Mega Kitchen and Bath

    4.9138 reviews9329 Georgia Ave, Silver Spring, MD 20910, USA

    View on Google
  3. 3

    Remodel Washington DC

    4.9128 reviews949 1st St SE, Washington, DC 20003, USA

    View on Google
  4. 4

    DC Home Remodeling

    5.096 reviews950 N Washington St Office # 309, Alexandria, VA 22314, USA

    View on Google
  5. 5

    Dupont Design and Remodeling

    4.896 reviews3170 Bladensburg Rd NE, Washington, DC 20018, USA

    View on Google
  6. 6

    DMV Fix Remodeling Construction, LLC

    5.088 reviewsLarchdale Rd, Laurel, MD 20708, USA

    View on Google
  7. 7

    Build Design Center Kitchen & Bath

    5.061 reviews1631 Wisconsin Ave NW, Washington, DC 20007, USA

    View on Google
  8. 8

    Noaman & Son Construction LLC

    5.060 reviews1629 K St NW #300, Washington, DC 20006, USA

    View on Google
  9. 9

    ColorTech Building Renovation LLC

    5.053 reviews2041 Martin Luther King Jr Ave SE, Washington, DC 20020, USA

    View on Google
  10. 10

    Four Brothers Design + Build

    4.551 reviews4009 Georgia Ave NW, Washington, DC 20011, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Washington bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every bathroom remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope, allowances and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Washington bathroom remodelers

  1. Step 1

    Tell Henry about your bathroom

    Your ZIP, the kind of remodel (refresh, full gut, tub-to-shower) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard bathroom remodelers in your Washington-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three bathroom remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What bathroom remodeling costs in Washington

Cosmetic refresh — no planned layout change$4,500–$11,000 estimated
Mid-range full remodel$16,000–$32,000 estimated
Upscale or primary bathroom remodel$35,000–$65,000+ estimated
Tub-to-shower conversion$6,000–$14,000 estimated
Walk-in or curbless shower$11,000–$24,000 estimated

Ranges are general estimates gathered from homeowner-reported quotes in the Washington area, not an offer or a quote for your project.

When to schedule bathroom remodeling in Washington

Bathroom work in Washington is largely indoors, but deliveries, access and curing conditions can still affect the schedule. Have the installer follow material temperature and humidity requirements, maintain ventilation and allow cure time before using the shower. Confirm actual crew availability, selection deadlines and inspection timing; reserve contingency time rather than rely on a universal seasonal promise.

Permits and HOA rules

DC Department of Buildings lists bathroom remodeling under Alteration & Repair permits. Its Homeowner's Center serves qualifying smaller projects in one- and two-family homes; condo projects may follow a different review path. Check plumbing and electrical permits separately. For historic properties, confirm any exterior vent or window change with the Historic Preservation Office as part of the permit process.

Licensing and insurance in District of Columbia

Check the remodeling business's license through DC Department of Licensing and Consumer Protection resources. Plumbers and electricians hold individual credentials through the Board of Industrial Trades. Verify the people or firms actually assigned to your project, and distinguish the business license from the specialty trade licenses needed for the work.

Define the bathroom scope before comparing prices

A Navy Yard condo bathroom and a Capitol Hill rowhouse bathroom involve different access and approval questions. Condo owners should check alteration agreements, shared stacks, work hours and common-area protection. Rowhouse owners should identify pipe routes through the floor below and budget for patching any adjoining ceiling opened during plumbing work.

For a Washington bathroom, list every fixture and surface that stays, changes or moves: toilet, vanity, tub, shower, lighting, ventilation, floor and wall tile. Specify whether demolition stops at existing finishes or exposes framing. Include debris removal, dust barriers, protection of the route through the house and repairs outside the bathroom. Each bidder needs the same description so a lower total does not simply hide missing work.

Keep plumbing moves separate from finish upgrades

Moving a toilet or shower drain in Washington can change the entire labor plan. A drain needs suitable slope, venting and a route that does not compromise framing. Ask the plumber to identify those constraints before approving the new layout. Where access requires opening a slab or a ceiling below, the estimate should include excavation or demolition, inspection access, restoration and the time needed before finishes can resume.

Keeping fixtures near their existing connections can preserve budget for durable surfaces or better storage. However, keeping the layout does not guarantee the old pipe is reusable. Have the quote distinguish planned relocation from repair of deteriorated supply or waste lines. If damage appears during demolition, require photos, a written repair scope and approval of the additional price before proceeding, rather than an unexplained increase on the final invoice.

Specify a complete shower waterproofing system

The tile and grout in a Washington shower are finishes, not a substitute for waterproofing. Ask the installer to name the pan, wall substrate and sheet or liquid membrane system, including how corners, niches, valves and drain connections are sealed. A traditional lined mortar pan and a bonded membrane system have different details; the proposal should follow one compatible manufacturer-approved assembly rather than mix products without a documented method.

Confirm the required cure times and any flood testing with the installer and inspecting authority before tile conceals the work. Curbless showers need a workable drain slope and a continuous waterproof transition at the entrance; the available floor depth can limit the design. Request photos before the tile goes on, written workmanship terms and maintenance instructions. Ventilation should discharge to the appropriate exterior location, not leave humid air trapped in an attic or wall cavity.

Make fixture allowances real dollar amounts

When comparing Washington bids, an allowance is a budget for a selection, not a promise of any product you choose. As illustrative planning figures, a vanity with top might carry $800–$2,500, a toilet $300–$900 and shower valve/trim $400–$1,200; tile might be budgeted at $6–$15 per square foot for material. These are estimates, not local offers. Match allowances to actual products available from your chosen supplier before signing.

Separate material allowances from installation labor, delivery, tax and disposal. Ask whether unused allowance is credited and what markup applies to an overage. A heavy tub, large-format tile or wall-mounted fixture can change labor as well as product cost, so request an installed-price comparison before upgrading. Confirm model numbers, rough-in dimensions and delivery dates early; substitutes should receive written approval rather than arrive after the room has been demolished.

Plan inspections and jurisdiction-specific approvals

DC Department of Buildings lists bathroom remodeling under Alteration & Repair permits. Its Homeowner's Center serves qualifying smaller projects in one- and two-family homes; condo projects may follow a different review path. Check plumbing and electrical permits separately. For historic properties, confirm any exterior vent or window change with the Historic Preservation Office as part of the permit process.

For the Washington project, put responsibility for each permit and inspection in the written agreement. Identify when rough plumbing, wiring, framing or waterproofing must remain visible and which completion approvals are needed. Historic review, condominium consent and building permits are different questions. If an address lies outside the city boundary, confirm its authority rather than applying city rules by proximity. Do not accept a claim that permits are unnecessary without checking the exact work involved.

Verify the contractor and the specialty trades

Check the remodeling business's license through DC Department of Licensing and Consumer Protection resources. Plumbers and electricians hold individual credentials through the Board of Industrial Trades. Verify the people or firms actually assigned to your project, and distinguish the business license from the specialty trade licenses needed for the work.

Ask the Washington remodeler which trades are employees and which are subcontracted, then verify the relevant credentials under the names actually performing the work. Request insurance documentation, recent comparable-project references and written warranty terms. Licensing is not a guarantee of a particular finish quality, and a business listing or review score is not a license check. Discuss who corrects failed inspections or defective work and how those responsibilities continue after the job closes.

Tie payments and change orders to documented progress

A useful Washington contract connects payments to understandable progress: approved material orders, completed demolition and rough-in, required inspection passes, finish installation and final completion. Agree the deposit and later amounts before work, following applicable consumer rules rather than an arbitrary percentage. Avoid paying most of the total for work not yet performed. Keep receipts and distinguish nonreturnable custom materials from ordinary labor payments so cancellation or delay terms are clear.

Every change order should state the new work, additional or reduced price, allowance credits and revised schedule before authorization. Do not treat a conversation during demolition as a substitute for written approval. At the end, check drainage, leaks, fan operation, doors, caulk, fixture alignment and remaining punch-list items. Obtain required final approvals and warranty information before making the agreed final payment; the contract should explain how small outstanding corrections will be resolved.

Areas Henry covers

Capitol Hill · Georgetown · Dupont Circle · Logan Circle · Columbia Heights · Petworth · Navy Yard · Shaw · Brookland · Cleveland Park

Common questions

Do I need permits for a bathroom remodel in Washington?

DC Department of Buildings lists bathroom remodeling under Alteration & Repair permits. Its Homeowner's Center serves qualifying smaller projects in one- and two-family homes; condo projects may follow a different review path. Check plumbing and electrical permits separately. For historic properties, confirm any exterior vent or window change with the Historic Preservation Office as part of the permit process.

What usually increases the price most?

Plumbing relocation and hidden repair work can add substantially more labor than a same-layout finish upgrade. Ask for separate line items and a site-specific estimate before choosing a new layout.

How should I compare fixture allowances?

Use the same product budget in every bid, separating materials from installation, tax and delivery. Agree credits, overage markups and any extra installation work in writing.

Is tile alone waterproof?

No. A shower needs a complete compatible waterproofing assembly at the pan, walls, drain and penetrations. Ask for the specified system, testing plan and documentation before tile covers it.

When should I approve a change order?

Before the additional work or upgraded purchase proceeds. The signed document should describe the change, price, allowance adjustment and schedule impact.

Get Washington bathroom remodel estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Bathroom Quotes