Bathroom remodelers in Johns Creek, GA

Johns Creek homeowners remodeling a bathroom are working with a building department that reviews plumbing and layout changes closely, and with housing stock ranging from late-1980s Northridge and River Club homes to newer construction in Shakerag and Medlock Bridge. Costs here track metro Atlanta's north Fulton market, where skilled trade labor is in demand and most full remodels involve moving at least one fixture. This hub covers what a bathroom remodel actually costs by project tier, when Johns Creek requires a permit, and how to verify a contractor's Georgia license before signing a contract.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Johns Creek bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 bathroom remodelers in Johns Creek, GA

The 10 Johns Creek bathroom remodelers with the most Google reviews.

  1. 1

    Forsyth Remodeling

    4.9115 reviews1035 Ivy St, Cumming, GA 30041, USA

    View on Google
  2. 2

    Remodeling Work 123

    5.086 reviews2841 Treehouse Ln, Lawrenceville, GA 30044, USA

    View on Google
  3. 3

    InDesign Kitchen and Bath Remodeling

    4.976 reviews11130 State Bridge Rd Ste C104, Johns Creek, GA 30022, USA

    View on Google
  4. 4

    Remodels By Design

    4.838 reviews11875 Jones Bridge Rd Ste B, Alpharetta, GA 30005, USA

    View on Google
  5. 5

    Halcyon Remodeling

    4.736 reviews3556 Old Milton Pkwy, Alpharetta, GA 30005, USA

    View on Google
  6. 6

    AIR Kitchen & Bath Center (Atlanta Intercontinental LLC)

    4.933 reviews5725 State Bridge Rd #202, Johns Creek, GA 30022, USA

    View on Google
  7. 7

    Progressive Home Renovations and Cabinet & Stone Showcase

    5.020 reviews3592 Old Atlanta Rd Ste 105, Suwanee, GA 30024, USA

    View on Google
  8. 8

    AR Johns Creek

    5.013 reviews100 Pine Bridge Trail, Alpharetta, GA 30022, USA

    View on Google
  9. 9

    Johns Creek Remodeling, LLC

    4.710 reviews10360 Medlock Bridge Rd F, Johns Creek, GA 30097, USA

    View on Google
  10. 10

    MC REMODELING, LLC

    5.06 reviews10590 Bridgemor Dr, Alpharetta, GA 30022, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Johns Creek bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every bathroom remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope, allowances and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Johns Creek bathroom remodelers

  1. Step 1

    Tell Henry about your bathroom

    Your ZIP, the kind of remodel (refresh, full gut, tub-to-shower) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard bathroom remodelers in your Johns Creek-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three bathroom remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What bathroom remodeling costs in Johns Creek

Cosmetic refresh (paint, fixtures, vanity swap, no layout change)$4,500–$9,000
Mid-range full remodel (new tub/shower, tile, vanity, floor)$13,000–$24,000
Upscale/primary bath remodel (custom tile, frameless glass, double vanity)$28,000–$55,000
Tub-to-shower conversion$5,500–$12,500
Walk-in/curbless shower build-out$9,500–$19,000
Powder room remodel (half bath)$3,500–$7,500
Plumbing relocation (moving toilet, tub, or shower drain)$1,800–$6,000 added to project

Ranges are general estimates gathered from homeowner-reported quotes in the Johns Creek area, not an offer or a quote for your project.

When to schedule bathroom remodeling in Johns Creek

Metro Atlanta's humid summers make bathroom ventilation and waterproofing especially important in Johns Creek, where many homes have slab-on-grade or crawlspace foundations that can shift slightly with seasonal moisture; a correctly installed vapor barrier and exhaust fan sized to the room (per code ventilation rates) reduce mold risk behind tile. Contractors in this market are often busiest in late spring and early fall, so homeowners planning a remodel around the holidays or before hosting should expect to schedule 4-8 weeks out.

Permits and HOA rules

The City of Johns Creek Building Division, part of Community Development, requires a permit for bathroom renovations that change the plumbing layout, move fixtures, or alter framing; a straightforward kitchen or bath renovation with the same layout and no plumbing changes is listed as not requiring a permit, per the city's own "Do I Need A Permit?" guidance (johnscreekga.gov/departments/community-development/building-permitting/do-i-need-a-permit/). Permits and inspections are handled through the city's Customer Self-Service (CSS) portal, and contractors must register their professional licenses with the city before applying. Homeowners should confirm scope-specific permit requirements directly with the Building Division (678-512-3250) rather than assume; never take a contractor's word that "no permit is needed" without checking.

Licensing and insurance in Georgia

Georgia requires residential and general contractors performing work for compensation to hold a license from the State Licensing Board for Residential and Commercial General Contractors, under the Secretary of State's Licensing Division. Homeowners can verify a contractor's license status through the Secretary of State's license lookup tool at sos.ga.gov (Licensing > Licensee Search > Building & Contractors > Residential and General Contractors). Plumbing work in a bathroom remodel typically requires a separately licensed Georgia plumber, and electrical work (adding or moving outlets, lighting, or exhaust fan wiring) requires a licensed Georgia electrical contractor. Note that some specialty trades, such as tile setters and painters, are not required to hold a state license in Georgia, so licensing verification matters most for the general contractor and any plumber or electrician on the job.

What drives bathroom remodel costs in Johns Creek

The biggest cost swing in any Johns Creek bathroom project is whether plumbing fixtures stay in place or move. A tub, toilet, or shower that stays in its existing footprint keeps a remodel in the mid-range tier because the plumber reconnects to existing lines; relocating a drain or supply line under a slab foundation, common in neighborhoods like Northridge and Sugar Mill built in the 1980s and 1990s, adds both material and labor cost and often extends the timeline by several days for slab-cutting and inspection.

Material allowances are the second driver. A homeowner choosing a $3-per-square-foot ceramic tile versus a $12-per-square-foot porcelain slab tile will see several thousand dollars of difference in a standard 50-60 square foot bathroom, and custom cabinetry or a frameless glass shower enclosure (common in the upscale tier) can add $2,000-$5,000 on its own.

Labor availability in north Fulton County also matters. Licensed plumbers and electricians serving Johns Creek, Alpharetta, and Duluth are frequently booked several weeks out during the spring and fall renovation season, and contractors who keep crews busy tend to price jobs at the higher end of the range quoted above rather than discount to fill a calendar gap.

Cosmetic refresh vs. full remodel: what changes at each tier

A cosmetic refresh in Johns Creek typically means a new vanity, faucet, toilet, mirror, lighting, and a fresh coat of moisture-resistant paint, with the existing tub, shower pan, and floor tile left in place. This tier is popular in homes going on the market in neighborhoods like River Club, where sellers want a bathroom to look updated without the cost or disruption of ripping out tile.

A mid-range full remodel replaces the tub or shower, retiles the floor and wet walls, and swaps the vanity and fixtures, generally keeping the existing layout. This is the most common scope homeowners request in Johns Creek's 1990s and early-2000s subdivisions, where original bathrooms have dated tile and fiberglass tub surrounds that have reached the end of their service life.

An upscale or primary bath remodel goes further: custom tile patterns, a freestanding tub paired with a separate curbless shower, double vanities, heated floors, and higher-end plumbing fixtures. Homeowners in larger primary suites found in Medlock Bridge and Country Club of the South estates often choose this tier when the bathroom's footprint allows for a true spa-style layout.

Waterproofing and why it matters more than tile choice

The waterproofing method behind the tile determines whether a remodel lasts 20 years or develops hidden water damage in five. A properly installed shower pan liner or a sheet/liquid membrane system applied over cement board, following manufacturer instructions, is what actually keeps water out of the wall and floor framing; the tile itself is cosmetic and not waterproof on its own.

In a humid climate like metro Atlanta's, a bathroom remodel that skips a vapor retarder behind tiled walls or relies on grout alone to block moisture is a common source of callbacks. Homeowners should ask any contractor bidding a Johns Creek remodel to specify, in writing, which waterproofing system they use and whether it carries a manufacturer warranty, not just a verbal assurance that "we always do it right."

Curbless and walk-in showers add another waterproofing consideration: because the floor slopes to a linear or center drain without a curb to contain water, the membrane must extend further across the subfloor, which is one reason walk-in shower conversions price higher per square foot than a standard shower-to-shower replacement.

Fixture allowances and where homeowners commonly overspend or underspend

A written estimate for a Johns Creek bathroom remodel should break out dollar allowances for each major fixture category: vanity and countertop, faucet and fixtures, tub or shower unit, toilet, tile (floor and wall separately), and lighting. A single lump-sum number without these line items makes it hard to tell where the budget is actually going or to swap one allowance up while cutting another to stay on budget.

Homeowners commonly underspend on exhaust ventilation, treating it as a minor line item, when in Georgia's humid summers an undersized or poorly vented fan is a leading cause of mold on ceiling drywall near the shower. Conversely, it's common to overspend on decorative tile accents that add cost without materially affecting the room's function or resale value compared to a quality installation with simpler tile.

Plumbing fixture allowances should also account for valve types; a thermostatic or pressure-balancing shower valve, now required by most plumbing codes for scald protection, costs more than a basic valve but is not optional in new shower installations.

Payment schedules and change orders

A standard milestone payment schedule for a Johns Creek bathroom remodel ties payments to completed phases rather than calendar dates: for example, a deposit at contract signing, a payment after demolition and rough plumbing/electrical pass inspection, another after tile and fixture installation, and a final payment after punch-list items are complete and the permit is closed. Homeowners should be cautious of contracts asking for more than a modest deposit before any work begins.

Change orders are common in bathroom remodels because demolition often reveals conditions that weren't visible during the initial quote, such as subfloor rot under an old tub or outdated wiring that doesn't meet current code. Any change to scope or price should be documented in writing, signed by both parties, before the additional work begins; a verbal agreement to "just add it to the bill" leaves the homeowner with no record if a dispute arises later.

Working with the Johns Creek Building Division

Johns Creek's Building Division, part of Community Development, manages all permitting through its online Customer Self-Service portal. Before a permit is issued, contractors must register their professional license with the city and be linked to the project in the system, and plans or applications are reviewed before fees are invoiced and paid.

For bathroom remodels specifically, the city's permitting guidance distinguishes between a renovation with the same layout and no plumbing changes, which does not require a permit, and one that changes the plumbing layout or involves structural alterations, which does. Homeowners should confirm the classification of their specific project with the Building Division's Permit Technicians rather than relying solely on a contractor's assessment, since the fee and inspection requirements differ based on scope.

Once a permit is issued, required inspections are scheduled and tracked through the same CSS portal, and the permit is closed out only after final inspection; keeping a copy of the issued permit and inspection history is useful both for warranty purposes and for a future home sale.

Areas Henry covers

Medlock Bridge · River Club · Shakerag · Northridge · Sugar Mill · St. Ives Country Club · Country Club of the South · Seven Oaks

Common questions

Do I need a permit to remodel a bathroom in Johns Creek?

It depends on scope. The City of Johns Creek's permitting guidance indicates that a bathroom renovation with the same layout and no plumbing changes generally does not require a permit, while a remodel that changes the plumbing layout, moves fixtures, or involves structural work does. Confirm your specific project with the city's Building Division before starting work.

How much does a full bathroom remodel cost in Johns Creek, GA?

A mid-range full remodel, including a new tub or shower, tile, vanity, and flooring with no major layout changes, typically runs about $13,000 to $24,000 as an estimate; upscale primary bath remodels with custom finishes commonly range from $28,000 to $55,000.

How do I verify a contractor's license in Georgia?

Use the Georgia Secretary of State's license lookup tool at sos.ga.gov under Licensing, Licensee Search, Building & Contractors, then Residential and General Contractors, to confirm an individual or company holds an active Georgia residential or general contractor license.

Does a tub-to-shower conversion require a plumbing permit in Johns Creek?

If the conversion involves relocating drain or supply lines, it typically requires a permit reviewed by the Building Division; a conversion that reuses the existing drain location in the same footprint may fall under the city's no-permit category for same-layout renovations, but homeowners should confirm with the Permit Technicians before work begins.

Are plumbers and electricians licensed separately from the general contractor in Georgia?

Yes. Georgia licenses plumbing and electrical contractors separately from residential and general contractors, so a bathroom remodel involving plumbing or electrical work should involve tradespeople holding their own current Georgia license in addition to the general contractor's license.

What's the difference between a walk-in shower and a curbless shower in terms of cost?

Both remove the tub, but a curbless or zero-threshold shower requires additional floor framing or slab modification and an extended waterproofing membrane to create the drainage slope without a curb, which is why curbless builds generally price toward the higher end of the walk-in shower range, roughly $9,500 to $19,000 as an estimate.

How long does a bathroom remodel take in Johns Creek?

A cosmetic refresh can often be completed in one to two weeks, while a mid-range full remodel with permitted plumbing changes commonly takes four to six weeks from demolition through final inspection, depending on contractor scheduling and any change orders discovered during demolition.

Get Johns Creek bathroom remodel estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Bathroom Quotes