Bathroom remodelers in Roanoke, VA

Roanoke homeowners remodeling a bathroom deal with a housing stock that ranges from early-1900s bungalows in Old Southwest to mid-century ranches in South Roanoke and newer construction near the Roanoke County line, so plumbing moves and waterproofing needs vary a lot from house to house. This page covers what a bathroom remodel actually costs in the Roanoke market, what the City of Roanoke permit process requires, and how to confirm a contractor's Virginia license before signing anything.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Roanoke bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 bathroom remodelers in Roanoke, VA

The 10 Roanoke bathroom remodelers with the most Google reviews.

  1. 1

    Re-Bath

    4.7550 reviews5119 Hollins Rd, Hollins, VA 24019, USA

    View on Google
  2. 2

    Rockfab Kitchen & Bath

    4.8308 reviews3406 Orange Ave NE, Roanoke, VA 24012, USA

    View on Google
  3. 3

    Bath Planet of SW Virginia

    4.8182 reviews322 Crowell Ln, Lynchburg, VA 24502, USA

    View on Google
  4. 4

    Alegre Construction Group

    5.0109 reviews4646 Plantation Rd NE, Roanoke, VA 24012, USA

    View on Google
  5. 5

    Bath Planet of SW Virginia Roanoke

    4.974 reviews4802 Valley View Blvd NW Suite LC-115, Roanoke, VA 24012, USA

    View on Google
  6. 6

    Senior Remodeling Experts

    4.966 reviews1371 Southside Dr Ste D, Salem, VA 24153, USA

    View on Google
  7. 7

    Moore Contracting (Kitchen and Bath)

    4.964 reviews100 E Main St, Salem, VA 24153, USA

    View on Google
  8. 8

    Blue Ridge Restoration and Construction

    4.357 reviews2011 Salem Ave SW, Roanoke, VA 24016, USA

    View on Google
  9. 9

    Southwest Builders Inc.

    5.055 reviews4052 Southmont Dr, Roanoke, VA 24014, USA

    View on Google
  10. 10

    F&S Building Innovations

    4.549 reviews2944 Orange Ave NE, Roanoke, VA 24012, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Roanoke bathroom remodelers.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every bathroom remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope, allowances and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Roanoke bathroom remodelers

  1. Step 1

    Tell Henry about your bathroom

    Your ZIP, the kind of remodel (refresh, full gut, tub-to-shower) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard bathroom remodelers in your Roanoke-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three bathroom remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What bathroom remodeling costs in Roanoke

Cosmetic refresh (paint, fixtures, vanity swap, no layout change)$4,500–$9,500
Mid-range full remodel (new tub/shower, tile, vanity, toilet, same footprint)$12,000–$22,000
Upscale/primary bath remodel (custom tile, double vanity, freestanding tub, upgraded fixtures)$26,000–$48,000
Tub-to-shower conversion$5,500–$11,000
Walk-in/curbless shower (includes added waterproofing and possible floor framing)$9,000–$18,000

Ranges are general estimates gathered from homeowner-reported quotes in the Roanoke area, not an offer or a quote for your project.

When to schedule bathroom remodeling in Roanoke

Roanoke's older homes, especially in Old Southwest, Raleigh Court, and South Roanoke, often have cast-iron drain lines, galvanized supply pipes, and plaster walls that slow demolition and add cost once a contractor opens the wall. Winter is a popular time to schedule interior bathroom work in the Roanoke Valley since it doesn't compete with exterior projects, but it can also mean longer lead times for tile and plumbing fixtures shipped from out of the region. Humidity and the Blue Ridge area's freeze-thaw cycles make exhaust fan sizing and proper vapor management in the shower assembly worth getting right the first time rather than retrofitting later.

Permits and HOA rules

The City of Roanoke's Permit Center, part of Planning, Building & Development at the Noel C. Taylor Municipal Building (215 Church Avenue SW, Room 170), issues combination building permits whenever a bathroom remodel involves both building work and at least one trade (plumbing, electrical, or HVAC); the general contractor applies for one combination permit and lists subcontractors rather than pulling separate trade permits. Projects are submitted through the Permit Center's Permit Counter Apps or the eTRAKiT online portal, where licensed contractors can apply directly and homeowners can track plan review and inspections. A homeowner acting as their own general contractor must file an Owner/Builder Affidavit to be exempt from the state contractor licensing requirement on the permit. If the home sits in one of Roanoke's historic districts, such as Old Southwest or Historic Gainsboro, and the remodel touches the building's exterior (for example, a new exhaust vent or window change tied to the bathroom), a Certificate of Appropriateness from the Architectural Review Board may also be required before the building permit is issued. Do not rely on fee estimates from secondhand sources; confirm current plan review and permit fees directly with the Permit Center before budgeting.

Licensing and insurance in Virginia

Virginia requires contractors to hold a license issued by the Board for Contractors within the Department of Professional and Occupational Regulation (DPOR). Licenses come in three classes, A, B, and C, based on the dollar value of the contracts a business can perform, plus a classification or specialty that determines the type of work allowed, so a bathroom remodeling contractor should carry the classification and class appropriate to the project's size. Class A requires at least $45,000 in net worth or equity and Class B requires at least $15,000, while contractors who don't meet those financial thresholds may be limited to a Class C license, which caps the size of jobs they can take on. Plumbing and electrical work performed as part of a bathroom remodel must be done by, or under the supervision of, a DPOR-licensed tradesman in that specialty, and the City of Roanoke's permit application asks for the DPOR license number of the contractor or registered design professional on the job. Homeowners can verify any contractor's or tradesman's license status directly through DPOR's license lookup tool before signing a contract.

What drives bathroom remodel costs in Roanoke

The single biggest cost driver in any Roanoke bathroom remodel is whether the plumbing stays in place or moves. Keeping the toilet, sink, and shower or tub in their existing locations lets a contractor reuse the existing drain and supply lines, which keeps labor and material costs in the mid-range tier. Relocating a toilet or shower drain, especially in a home built before the 1960s with cast-iron or clay waste lines under a slab or crawlspace, adds plumbing labor, potential concrete cutting, and inspection time that can push a project from the mid-range tier into the upscale range.

Fixture and material allowances are the second major variable. A remodel budget built around a $600 vanity and stock tile will land very differently from one built around a $2,200 vanity, a curbless shower pan, and natural stone. Homeowners should ask contractors to state allowances for tile, vanity, countertop, fixtures, and lighting as separate dollar figures in the written quote rather than as a single lump sum, so it's clear what happens to the budget if a homeowner picks a tile that costs more than the allowance.

Finally, the condition of what's behind the walls matters more in Roanoke's older housing stock than in newer subdivisions. Homes in Old Southwest, Raleigh Court, and parts of South Roanoke frequently have plaster-and-lath walls, undersized electrical circuits, and no vapor barrier behind the original tile. Opening those walls can reveal moisture damage or subfloor rot that wasn't visible during the initial walkthrough, which is why a contract should spell out how change orders for unforeseen conditions are priced and approved in writing before work proceeds.

Scope by fixture: what to budget for each piece

Toilets in a mid-range remodel typically run $350–$900 installed, including a standard comfort-height model; a water-saving or smart-bidet toilet moves that figure toward the $1,000–$1,800 end. Vanities and countertops vary widely: a 30–36 inch stock vanity with a cultured marble top lands around $600–$1,500 installed, while a custom or furniture-style vanity with a quartz or natural stone top can run $2,000–$4,500.

Showers and tubs are usually the largest line item. A standard alcove tub-and-tile surround replacement runs toward the lower end of the mid-range tier, while a tiled shower with a glass enclosure, niche, and bench adds significantly more labor for tile setting and waterproofing. Showerheads, valves, and controls should be itemized separately from the shower pan and tile so a homeowner can see where a thermostatic valve or rain-head upgrade adds cost.

Lighting, ventilation, and flooring round out the scope. An exhaust fan upgrade sized correctly for the room's cubic footage, vented to the exterior rather than into an attic space, typically adds $250–$600 to the project but is one of the most important line items for preventing mold in a humid climate like the Roanoke Valley's. Heated floors, if included, are usually a $600–$1,200 add-on depending on square footage.

Waterproofing methods that matter in this climate

A shower that fails from water intrusion almost always fails because of the waterproofing layer behind the tile, not the tile itself. In the Roanoke area, where humidity swings seasonally and many homes have wood-framed shower walls rather than concrete block, a sheet or liquid waterproofing membrane system applied directly over cement board or foam backer board is the standard approach for a mid-range to upscale remodel, replacing the older method of a tar-paper-and-mortar pan.

For curbless or walk-in showers, the waterproofing scope expands to include the subfloor transition at the shower entrance, since there's no curb to contain minor overflow. A properly built curbless shower uses a sloped mortar bed or a pre-formed sloped shower base tied into the membrane system, and often requires minor floor framing adjustments to create the slope toward the drain, which is part of why this style costs more than a standard shower with a curb.

Homeowners should ask contractors directly which waterproofing system they use and whether it's rated for the specific tile and setting method chosen, and get that system named in the written contract rather than left as an assumption.

Plumbing moves: the real cost multiplier

Moving a toilet flange, relocating a shower drain, or shifting a sink's water supply lines even a few feet can require opening a wall or floor cavity that would otherwise stay closed. In a slab-on-grade home, moving a drain line means cutting and patching concrete, which adds both cost and schedule time for the concrete to cure before flooring goes back down.

In Roanoke's older homes with cast-iron waste stacks, a contractor may find that the existing pipe is undersized or deteriorated once it's exposed, which is a common source of change orders. Homeowners planning a layout change, such as converting a half bath into a full bath or combining two small rooms into one larger bathroom, should expect the plumbing relocation itself, independent of finishes, to be one of the largest line items in the estimate.

Because plumbing work typically requires permit sign-off and inspection at the rough-in stage before walls are closed, scheduling a layout change also adds time to the project timeline. A contractor who quotes a layout change without mentioning a rough-in inspection milestone is leaving out a step the City of Roanoke's permit process requires.

Payment schedules and change orders

A standard, fair milestone payment schedule for a Roanoke bathroom remodel ties payments to completed phases rather than to the calendar: a deposit to order materials and secure the schedule, a payment at demolition and rough-in completion, a payment after rough plumbing and electrical inspections pass, and a final payment due only after the finished work passes final inspection and the homeowner does a walkthrough. Paying the bulk of the contract price before plumbing and electrical rough-in has been inspected removes the homeowner's leverage if problems appear later.

Change orders should be documented in writing before the additional work begins, with the added cost and any schedule impact spelled out and signed by both parties. This matters most when a wall is opened and unexpected conditions, such as rotted subfloor, undersized wiring, or deteriorated cast-iron pipe, are discovered, since these are the most common sources of disputes when the added cost wasn't agreed to in advance.

Henry's approach connects homeowners with three local Roanoke-area bathroom remodeling pros who each agree to show up for the appointment, provide an honest written quote with itemized allowances, and finish the work as scoped, rather than leaving a homeowner to vet contractors cold.

Permits and inspections in the City of Roanoke

Any bathroom remodel in the City of Roanoke that involves plumbing, electrical, or HVAC work alongside the building work requires a combination permit through the Permit Center, applied for by the general contractor, who must list every subcontractor working on the project. Applications go through the Permit Center's online apps or the eTRAKiT portal, where plans can be uploaded, fees paid, and inspections scheduled.

A homeowner who wants to do the work themselves without hiring a licensed general contractor must file an Owner/Builder Affidavit as part of the permit application to claim the exemption from state contractor licensing requirements, but this does not exempt plumbing or electrical subcontractors from needing their own trade licenses. For homes in a designated historic district, exterior changes tied to the bathroom project, such as a new vent penetration or a window alteration, may also need a Certificate of Appropriateness from the city's Architectural Review Board before the building permit can be issued.

Inspections typically occur at the rough-in stage, after framing and before walls are closed, and again at final completion. Homeowners should confirm current permit and plan review fees directly with the Permit Center at the Noel C. Taylor Municipal Building, since fee schedules change and should never be assumed from a prior project.

Confirming a contractor's Virginia license before hiring

Virginia does not allow general contracting work above small thresholds to be performed without a DPOR-issued contractor license, and the license class, A, B, or C, caps the value of the contracts that business can legally take on. Class A contractors have shown at least $45,000 in net worth or equity, and Class B contractors at least $15,000; contractors who haven't met those financial requirements may hold a Class C license, which is limited to smaller projects.

Beyond the class, the license carries a classification or specialty that governs the type of work allowed; a homeowner should confirm the contractor's classification covers residential building or remodeling, not just a narrower specialty, before signing. Plumbing and electrical subcontractors on the job should likewise hold their own DPOR tradesman licenses in those specialties.

DPOR maintains a public license lookup tool, and homeowners should check it directly before signing a contract rather than relying on a license number printed on a business card or truck. The City of Roanoke's own permit application also asks for the DPOR license number of the contractor applying, which gives another point of verification.

Areas Henry covers

Old Southwest · Raleigh Court · South Roanoke · Grandin Village · Wasena · Hollins · Garden City · Virginia Heights

Common questions

Do I need a permit to remodel a bathroom in Roanoke, VA?

If the remodel includes plumbing, electrical, or HVAC work in addition to building work, which most full bathroom remodels do, the City of Roanoke requires a combination building permit through its Permit Center. A purely cosmetic refresh with no plumbing, electrical, or structural changes may not require a permit, but homeowners should confirm with the Permit Center directly for their specific scope.

How much does a full bathroom remodel cost in Roanoke?

A mid-range full remodel that keeps the existing layout typically runs about $12,000 to $22,000 in the Roanoke market, as an estimate. Costs rise significantly if plumbing fixtures are relocated, finishes are upgraded, or the project shifts into an upscale primary bathroom scope.

Does Virginia require a contractor's license for bathroom remodeling?

Yes. Virginia's Board for Contractors, part of DPOR, licenses contractors in Class A, B, or C based on project size, along with a classification that governs the type of work. Plumbing and electrical trades on the job should also hold their own DPOR tradesman licenses.

Can I pull the permit myself and act as my own general contractor?

The City of Roanoke allows homeowners to apply for an exemption from state contractor licensing by filing an Owner/Builder Affidavit with the permit application. This doesn't exempt plumbing or electrical subcontractors from needing their own licenses for that work.

Does a bathroom remodel in a historic Roanoke neighborhood need extra approval?

If the home is in one of Roanoke's designated historic districts, such as Old Southwest, and the project changes anything on the building's exterior, for example adding a vent or altering a window, a Certificate of Appropriateness from the city's Architectural Review Board may be required before the building permit is issued. Interior-only work generally doesn't trigger this review, but it's worth confirming with the city.

Why does moving a toilet or shower drain cost so much more?

Relocating plumbing often means opening a wall, floor, or slab to access and reroute drain and supply lines, which adds demolition, patching, and inspection time beyond what a same-footprint remodel requires. In older Roanoke homes with cast-iron or galvanized piping, the existing pipe condition can also add unplanned cost once it's exposed.

What should be in a bathroom remodel contract before I sign?

A solid contract itemizes allowances for tile, vanity, countertop, and fixtures as dollar amounts, states the waterproofing method being used, lays out a milestone payment schedule tied to inspection and completion stages, and spells out how change orders for unforeseen conditions will be priced and approved in writing.

Sources

Get Roanoke bathroom remodel estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Bathroom Quotes