Kitchen remodeling companies in Los Angeles, CA
A kitchen remodel in Los Angeles can range from a weekend cabinet refresh to a full layout overhaul with new plumbing and gas lines, and costs vary widely between a Highland Park bungalow and a Brentwood estate. Before hiring anyone, homeowners need to understand what the Department of Building and Safety requires, what a licensed contractor can legally ask for as a deposit, and realistic price ranges by project tier.
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Los Angeles kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
Top 10 kitchen remodeling companies in Los Angeles, CA
The 10 Los Angeles kitchen remodeling companies with the most Google reviews.
- 1View on Google
Shulmen Construction LA
5.0370 reviews1010 S Bedford St, Los Angeles, CA 90035, USA
- 2View on Google
We The People Construction
4.8167 reviews958 N Western Ave Suite 10076, Los Angeles, CA 90029, USA
- 3View on Google
AP Remodeling Inc.
4.9157 reviews5972 Washington Blvd, Culver City, CA 90232, USA
- 4View on Google
Maingreen Remodel & Construction
4.9157 reviews914 S Robertson Blvd Suite 200A, Los Angeles, CA 90035, USA
- 5View on Google
Ivy Builders Remodeling, Kitchen & Bathroom Remodeling
4.9113 reviews12100 Wilshire Blvd #1450, Los Angeles, CA 90025, USA
- 6View on Google
Modern Kitchen Remodeling
4.980 reviews1411 S Garfield Ave #407, Alhambra, CA 91801, USA
- 7View on Google
N & L Remodeling
4.978 reviews108 S Coronado St, Los Angeles, CA 90057, USA
- 8View on Google
Master Kitchen
5.075 reviews855 Croft Ave, Los Angeles, CA 90069, USA
- 9View on Google
LOS ANGELES KITCHEN AND BATHROOM REMODELING
5.074 reviews4419 Van Nuys Blvd UNIT 407, Sherman Oaks, CA 91403, USA
- 10View on Google
SA Home Remodeling and Restoration - Santa Monica Kitchen and Bathroom Remodeling
5.074 reviews11518 Santa Monica Blvd Ste 302, Los Angeles, CA 90025, USA
Ratings and reviews powered by Google
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Los Angeles kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
The Henry Standard
Every kitchen remodeler in our network agrees to three things.
Show up
Call back. Keep appointments. And if something changes, communicate it.
Quote honestly
Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.
Finish the work
Complete every item on the scope and clean up before calling it finished.
Nothing revolutionary. Just the way we believe doing business should still be done.
How Henry matches you with Los Angeles kitchen remodelers
- Step 1
Tell Henry about your kitchen
Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.
- Step 2
Only three pros get it
Only three Henry Standard kitchen remodelers in your Los Angeles-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.
- Step 3
Compare up to three quotes
You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.
What kitchen remodeling costs in Los Angeles
| Cosmetic refresh (paint, hardware, lighting) | $8,000–$18,000 |
| Mid-range remodel, same layout | $35,000–$65,000 |
| Upscale remodel with layout change | $75,000–$150,000+ |
| Cabinet refacing | $7,000–$16,000 |
| New stock-to-semi-custom cabinets | $15,000–$40,000 |
| Countertops - laminate | $1,500–$4,000 |
| Countertops - quartz | $4,500–$10,000 |
| Countertops - granite | $4,000–$9,000 |
| Countertops - marble | $6,000–$14,000 |
| Backsplash installation | $1,200–$4,500 |
Ranges are general estimates gathered from homeowner-reported quotes in the Los Angeles area, not an offer or a quote for your project.
When to schedule kitchen remodeling in Los Angeles
Fall and winter (October through February) tend to be the slowest season for LA kitchen remodelers, which can mean shorter scheduling waits and more room to negotiate on labor, while spring and early summer bring a rush of homeowners trying to finish before summer entertaining season. Contractors who also handle fire-rebuild and insurance work in the region can get booked out further during spring, so locking in a contract early in the year often means a faster start.
Permits and HOA rules
The Los Angeles Department of Building and Safety (LADBS) issues an Express Permit for kitchen remodels that keep the existing wall layout and do not add new plumbing or electrical penetrations into existing walls, meaning cabinets, flooring, counters, and fixture swaps can usually be combined into one no-plan-check permit processed online or by appointment at LADBS offices in Metro, Van Nuys, West LA, San Pedro, or South LA. If the project moves walls, adds openings, or runs new plumbing or electrical into a wall that didn't have it before, LADBS requires a full plan check with two sets of 1/4-inch-scale existing and proposed floor plans before any permit issues, and typically one final inspection covers a straightforward kitchen permit once the work is complete.
Licensing and insurance in California
Any contractor performing kitchen remodel work in Los Angeles for $500 or more in combined labor and materials must hold an active California Contractors State License Board (CSLB) license, and homeowners can verify license status directly on the CSLB website. California law caps a home improvement down payment at $1,000 or 10 percent of the contract price, whichever is less, and every subsequent progress payment must be tied to work or materials already delivered, not work still to be done. Plumbing and electrical subcontractors working under the general contractor must also carry the matching CSLB classification (C-36 for plumbing, C-10 for electrical) rather than working under a general B license alone for specialty scopes.
What drives kitchen remodel costs in Los Angeles
The single biggest cost driver in any LA kitchen remodel is whether the layout and the plumbing or gas lines move. Keeping the sink, range, and dishwasher in their existing locations keeps a project in LADBS Express Permit territory and avoids the labor cost of relocating supply lines, drain lines, and gas runs under a slab or through a crawlspace.
Older housing stock in neighborhoods like Highland Park, Eagle Rock, and Los Feliz often hides knob-and-tube wiring or undersized electrical panels behind the walls, and a kitchen remodel frequently becomes the trigger for a panel upgrade once a contractor opens the walls. Homes in hillside areas such as Silver Lake or the Santa Monica Mountains-adjacent streets can also add cost for material staging and access.
Square footage matters less than most homeowners expect; a small galley kitchen with high-end appliances and custom cabinetry can cost more than a larger kitchen finished with stock materials.
Scope by area: what's actually being replaced
A cosmetic refresh generally covers new paint, cabinet hardware, a new faucet, and updated lighting fixtures without touching cabinet boxes, plumbing, or flooring, which is why it stays at the low end of the cost table.
A mid-range same-layout remodel usually includes new cabinet boxes or a full reface, new countertops, a tile or luxury vinyl floor, new appliances, and updated lighting, all without moving the sink or range.
An upscale remodel with a layout change is where island additions, wall removals between kitchen and dining room, and relocated plumbing or gas lines come in, and it's the tier most likely to require a full LADBS plan check rather than an express permit.
Setting realistic allowances
Homeowners should budget specific dollar allowances rather than vague percentages: a reasonable allowance for mid-range cabinetry is $150 to $400 per linear foot installed, a plumbing fixture allowance (faucet, sink, disposal) runs $800 to $2,500, and a lighting allowance for recessed cans plus pendants typically lands between $1,200 and $3,000.
An appliance allowance deserves its own line item since ranges, hoods, and refrigerators can swing a budget by thousands of dollars depending on brand; a mid-range appliance package in LA commonly runs $6,000 to $15,000 for a four-piece suite.
Any allowance that gets exceeded during selection should trigger a written change order before the contractor orders materials, not an informal conversation.
Lead times for cabinets and countertops
Semi-custom and custom cabinets ordered for an LA kitchen typically take 8 to 14 weeks from final measurement to delivery, and that clock doesn't start until the layout is finalized and a deposit is paid, so homeowners should order cabinets well before demolition begins.
Stone countertop fabricators need an accurate template of the installed cabinets before cutting slabs, which usually adds 2 to 3 weeks after cabinet installation; quartz and granite templates-to-install timelines run similar, while imported marble can take longer if the slab has to be special-ordered.
Backsplash tile, especially imported or handmade tile, can also have its own lead time of several weeks, so it's worth confirming availability before finalizing a tile selection.
Payment schedules and change orders
Under California law the maximum down payment a licensed contractor can collect is $1,000 or 10 percent of the contract price, whichever is less, and the contract must spell this out in bold type along with a full schedule of progress payments tied to completed phases.
A typical milestone schedule for an LA kitchen remodel pays out after demolition and rough plumbing/electrical are complete, again after cabinet installation, again after countertop and backsplash installation, and a final payment held until after the LADBS final inspection passes.
Any change to scope, materials, or price must be documented in a signed change order before the new work starts; a contractor who performs extra work on a verbal promise has little recourse if a dispute arises later.
Choosing a contractor in Los Angeles
Henry's approach sends the remodel request to three local pros, each of whom agrees to show up, quote honestly in writing, and finish the work, rather than relying on star ratings or review counts that can be gamed.
Before signing, confirm the contractor's CSLB license is active and in good standing, check that their listed classification covers the scope (a general B license can run the job, but plumbing and electrical subs need their own C-36 and C-10 licenses), and get the permit plan in writing — specifically who pulls the LADBS permit and when.
Areas Henry covers
Silver Lake · Highland Park · Eagle Rock · Mar Vista · Brentwood · Sherman Oaks · Los Feliz · Mid-City · Westchester · Echo Park
Common questions
Do I need a permit to remodel my kitchen in Los Angeles?
Yes if any work beyond simple cosmetic swaps is involved. LADBS offers an Express Permit (no plan check) for kitchen remodels that don't change walls or add new plumbing/electrical penetrations into existing walls; anything that changes the layout or adds new plumbing or electrical runs into a wall requires a full plan check with existing and proposed floor plans.
How much can a contractor ask for as a down payment in California?
By state law, the maximum down payment is $1,000 or 10 percent of the total contract price, whichever is less. Every payment after that must correspond to work or materials already completed or delivered.
How do I verify a contractor's license in Los Angeles?
Check the license number on the Contractors State License Board (CSLB) website to confirm the license is active, see its classification, and check for any disciplinary history.
How long does a full kitchen remodel take in LA once permits are approved?
A mid-range remodel that keeps the existing layout typically runs 6 to 10 weeks once demolition starts, not counting cabinet and countertop lead times ordered beforehand. A layout-change remodel requiring a full LADBS plan check and inspections can take 3 to 5 months from permit submission to final sign-off.
What inspections does LADBS require for a kitchen remodel?
For an Express Permit kitchen remodel, LADBS typically requires one final inspection once all work is complete. Projects that go through full plan check because of wall or plumbing/electrical changes usually require rough and final inspections at each applicable trade stage.
More home services in Los Angeles
Nearby California markets
Sources
Get Los Angeles kitchen remodeling estimates in writing.
Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.
Get My Free Kitchen Quotes