Kitchen remodeling companies in Tampa, FL
A kitchen remodel in Tampa runs from a quick cosmetic refresh to a full gut-and-reconfigure, and the price swings widely depending on whether you're moving plumbing or gas lines, what cabinet and countertop tier you pick, and how much of the existing layout stays put. This hub breaks down realistic Tampa-area pricing, the City of Tampa permit process, Florida contractor licensing requirements, and the questions worth asking before you sign a contract.
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Tampa kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
Top 10 kitchen remodeling companies in Tampa, FL
The 10 Tampa kitchen remodeling companies with the most Google reviews.
- 1View on Google
Revive Design And Renovation
4.9429 reviews3102 W Kennedy Blvd, Tampa, FL 33609, USA
- 2View on Google
CMK Construction, Inc
5.0408 reviews13329 W Hillsborough Ave #104, Tampa, FL 33635, USA
- 3View on Google
Step Up Home Improvements
4.9324 reviews4401 E Hillsborough Ave, Tampa, FL 33610, USA
- 4View on Google
Top Notch Remodelers LLC
4.9214 reviews5688 W Crenshaw St #100, Tampa, FL 33634, USA
- 5View on Google
Premiere Builders & Remodeling
4.9209 reviews5103 Memorial Hwy, Tampa, FL 33634, USA
- 6View on Google
Peacock Alley Remodeling
5.0181 reviews1646 W Snow Ave #129, Tampa, FL 33606, USA
- 7View on Google
Salt & Pepper Construction
4.8122 reviews3113 N Armenia Ave, Tampa, FL 33607, USA
- 8View on Google
CraftLine Remodeling
5.0119 reviews306 E Tyler St, Tampa, FL 33602, USA
- 9View on Google
YDY Professional Construction LLC
4.8101 reviews8711 N Temple Ave, Tampa, FL 33617, USA
- 10View on Google
S & W Kitchens
4.594 reviews3215 S MacDill Ave, Tampa, FL 33629, USA
Ratings and reviews powered by Google
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Tampa kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
The Henry Standard
Every kitchen remodeler in our network agrees to three things.
Show up
Call back. Keep appointments. And if something changes, communicate it.
Quote honestly
Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.
Finish the work
Complete every item on the scope and clean up before calling it finished.
Nothing revolutionary. Just the way we believe doing business should still be done.
How Henry matches you with Tampa kitchen remodelers
- Step 1
Tell Henry about your kitchen
Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.
- Step 2
Only three pros get it
Only three Henry Standard kitchen remodelers in your Tampa-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.
- Step 3
Compare up to three quotes
You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.
What kitchen remodeling costs in Tampa
| Cosmetic refresh (paint, hardware, fixtures, same layout) | $6,000–$15,000 |
| Mid-range remodel, same layout | $25,000–$50,000 |
| Upscale remodel with layout change | $60,000–$120,000+ |
| Cabinet refacing | $6,000–$14,000 |
| New cabinets (stock to semi-custom) | $10,000–$30,000 |
| Countertops: laminate | $1,500–$3,500 |
| Countertops: quartz | $4,000–$9,000 |
| Countertops: granite | $3,500–$8,500 |
| Backsplash installation | $1,000–$3,500 |
Ranges are general estimates gathered from homeowner-reported quotes in the Tampa area, not an offer or a quote for your project.
When to schedule kitchen remodeling in Tampa
Tampa's rainy season runs roughly June through September, with afternoon thunderstorms that can delay deliveries and any exterior work tied to a kitchen addition, such as roof penetrations for new venting. Many homeowners aim to start demolition in late fall or winter so the kitchen is back in service before hurricane season, and contractors' schedules tend to book up fastest in January through March. If your remodel involves exterior wall changes, factor in wind-load and impact-glazing requirements that apply across Hillsborough County construction.
Permits and HOA rules
Kitchen remodels in Tampa are filed with the City of Tampa Construction Services Center under the Residential Building Alterations (Renovations) record type, which explicitly covers kitchen and bathroom remodels. Any work touching electrical, plumbing, gas lines, structural walls, or mechanical ventilation needs its own permit in addition to the building permit, and plans typically need to show the existing and proposed floor plan, smoke detector locations, and code edition in effect. Permits and inspections are managed through the City's Accela Citizen Access portal. Properties outside Tampa's city limits but within unincorporated Hillsborough County go through Hillsborough County Development Services instead of the City of Tampa office — confirm jurisdiction by address before applying. A cosmetic refresh that doesn't touch plumbing, electrical, gas, or structure may not require a permit at all, but any layout change almost always will.
Licensing and insurance in Florida
General, building, and residential contractors in Florida are licensed through the Florida Department of Business and Professional Regulation's Construction Industry Licensing Board under Chapter 489, Part I of the Florida Statutes. Licenses come in two forms: state-certified contractors, who can work anywhere in Florida, and state-registered contractors, who are limited to the local jurisdictions where they're registered. Plumbing and electrical work on a kitchen remodel typically requires a separately licensed plumbing or electrical contractor pulling their own permit, rather than falling under a general contractor's license. Always verify a contractor's license number directly through the DBPR's online license-verification tool before signing anything. On the deposit side, Florida doesn't cap how much a contractor can collect up front, but under Florida Statutes section 489.126, any initial payment of more than 10% of the contract price obligates the contractor to apply for permits within 30 days and start work within 90 days of permit issuance.
What drives the cost of a Tampa kitchen remodel
The single biggest cost driver in most Tampa kitchen remodels isn't the finishes — it's whether the plumbing or gas lines move. Shifting a sink, dishwasher, or gas range to a new wall means rerouting supply and drain lines, which in many of Tampa's older homes in Seminole Heights or Hyde Park also means dealing with cast iron or galvanized pipe that may need partial replacement.
Older bungalows and 1950s-60s ranch homes common in neighborhoods like Carrollwood and Palma Ceia often have smaller, boxed-in kitchens, so opening a wall to the dining room adds structural costs — header beams, possible load-bearing wall engineering, and drywall patching that a same-footprint remodel in a newer Tampa Palms or New Tampa home wouldn't need.
Scope by area matters too: a reconfigured kitchen that also touches an adjacent laundry or mudroom nook for an expanded island will cost meaningfully more than a straight cabinet-and-counter swap in the same four walls.
Setting realistic allowances
Most Tampa contracts set per-category allowances rather than locking in exact products up front, since cabinet and tile selections are often made after the contract is signed. Typical allowances for a mid-range remodel run around $8,000–$15,000 for cabinets, $3,000–$6,000 for countertops, $1,500–$3,000 for appliances beyond what's being reused, and $800–$1,500 for plumbing fixtures.
If you pick materials above the allowance — say, a waterfall quartz island edge or inset cabinetry — that difference is billed as a change order, not absorbed into the original contract price. Ask your contractor to show the allowance line items separately in the written estimate so you can see exactly what's budgeted versus what's a selection you still need to make.
Cabinet and countertop lead times
Stock cabinets can often be in stock or delivered within 2-4 weeks, but semi-custom and custom cabinet lines — more common in upscale South Tampa and Davis Islands remodels — regularly run 8-12 weeks from order to delivery, and that clock doesn't start until final measurements and selections are locked in.
Countertop fabrication for quartz or granite typically takes 1-3 weeks after cabinets are installed and the space is templated, since fabricators need the exact in-place cabinet dimensions before cutting slabs. Factoring these lead times into your schedule up front avoids a kitchen sitting half-finished for weeks while cabinets or countertops are in production.
Payment schedules and protecting your deposit
A typical milestone schedule for a Tampa kitchen remodel might break payments into a deposit at signing, a progress payment at rough-in (after demolition and before drywall), another at cabinet installation, and a final payment at completion once a punch list is signed off.
Because Florida law attaches permit and start-work deadlines to any deposit over 10% of the contract price, homeowners should avoid paying a large upfront deposit to a contractor who hasn't already pulled the permit or given a firm start date. If a contractor collects more than 10% and then doesn't apply for permits within 30 days or start work within 90 days of permits issuing, that's a statutory violation you can raise in writing.
Change orders in writing
Once demolition opens up a wall, it's common to find something unexpected — outdated wiring, moisture damage near a sink, or plumbing that doesn't match the original plans. Any extra work beyond the original scope should come back to you as a written change order with a price and timeline impact before the crew proceeds, not as a verbal heads-up followed by a surprise on the final invoice.
Henry's approach asks three local pros to each quote the job honestly in writing, which gives you a baseline to compare against when a change order comes up mid-project — you'll know whether the added cost is reasonable for Tampa-area labor and material rates.
Permits in practice for Tampa homeowners
For most kitchen remodels inside Tampa city limits, your contractor files the Residential Building Alterations application with the City's Construction Services Center, which also issues separate electrical, plumbing, and mechanical permits as needed for the same project.
If you're hiring a contractor, confirm they're pulling the permit themselves under their license rather than asking you to pull an owner-builder permit — owner-builder permits put the legal responsibility for code compliance on you, not the contractor, and most licensed pros will handle this directly.
Questions to ask and red flags
Ask each Tampa remodeler for their DBPR license number, who will pull the Residential Building Alterations permit, and which licensed plumber and electrician will handle the trade work. Have the cabinet line and countertop material written into the quote so bids can be compared on the same products.
Be cautious of a large upfront deposit with no permit filed, a quote that leaves out permits on a job that moves plumbing or gas, or pressure to sign the same day. Under Florida's deposit rule, a contractor taking more than 10% up front has firm deadlines to apply for permits and start work.
Areas Henry covers
Hyde Park · Seminole Heights · Davis Islands · South Tampa · Westshore · Tampa Palms · Ybor City · Carrollwood · New Tampa · Palma Ceia
Common questions
Do I need a permit to remodel my kitchen in Tampa?
If the work involves plumbing, electrical, gas lines, or structural changes, yes — it's filed under the City of Tampa's Residential Building Alterations permit type. A simple cosmetic update that doesn't touch those systems may not require one, but it's worth confirming with Construction Services before starting.
How long does a kitchen remodel take in Tampa?
A cosmetic refresh can take 1-2 weeks. A mid-range remodel with new cabinets and countertops typically runs 6-10 weeks once materials arrive, and a full layout change with permitting and inspections can stretch to 3-4 months.
How do I verify a contractor's license in Florida?
Use the DBPR's online license-verification tool at MyFloridaLicense.com, search by the contractor's name or license number, and confirm the license is active and covers the right category of work before signing a contract.
Is there a limit on how much deposit a contractor can ask for in Florida?
Florida doesn't set a dollar or percentage cap, but any initial payment over 10% of the contract price legally obligates the contractor to apply for permits within 30 days and start work within 90 days of permit issuance.
What's the most expensive part of a Tampa kitchen remodel?
Moving plumbing or gas lines to change the layout is usually the biggest cost driver, followed by custom or semi-custom cabinetry. Keeping the existing footprint and reusing supply lines keeps costs significantly lower.
Can I pull my own permit and act as the contractor?
Yes, through an owner-builder permit, but this makes you legally responsible for code compliance and coordinating all trades. Most homeowners hiring a licensed contractor let the contractor pull the permit under their own license instead.
More home services in Tampa
Nearby Florida markets
Sources
- City of Tampa — Residential Remodeling Permits
- City of Tampa — Residential Alterations Permit Application Guide
- Florida DBPR — Construction Industry Licensing Board
- Florida Statutes Section 489.126 — Moneys Received by Contractors
- The Florida Bar — Building or Remodeling a Home in Florida
- City of Tampa Accela Citizen Access Permit Portal
Get Tampa kitchen remodeling estimates in writing.
Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.
Get My Free Kitchen Quotes