Kitchen remodeling companies in Boston, MA
Boston's kitchen remodels range from a weekend-friendly refresh in a Dorchester triple-decker to a full layout change in a Back Bay brownstone, and costs shift a lot depending on whether walls, plumbing, or gas lines move. This hub covers realistic Boston-area pricing by project tier, what Inspectional Services Department (ISD) actually requires, how to confirm a contractor's state registration before signing anything, and local neighborhood considerations for older housing stock.
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Boston kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
Top 10 kitchen remodeling companies in Boston, MA
The 10 Boston kitchen remodeling companies with the most Google reviews.
- 1View on Google
Bay State Remodeling
4.8183 reviews121B Tremont St Ste 24, Brighton, MA 02135, USA
- 2View on Google
YD Construction Inc
5.0122 reviews7 Lakespur, Wayland, MA 01778, USA
- 3View on Google
Kitchen Nation
5.081 reviews311 Washington St #2, Brookline, MA 02445, USA
- 4View on Google
Schlickmann Construction
5.052 reviews270 Main St, Stoneham, MA 02180, USA
- 5View on Google
Sun Shore Construction
4.949 reviews163 Highland Ave #1051, Needham, MA 02494, USA
- 6View on Google
Pro One Remodeling Services
4.949 reviews132 Breedens Ln, Revere, MA 02151, USA
- 7View on Google
Greenmen Builders
4.945 reviews399 Chestnut St, Needham, MA 02492, USA
- 8View on Google
X'CLUSIVE RENOS & REMODELING LLC
4.942 reviews17 Blakeville St, Boston, MA 02121, USA
- 9View on Google
Boston Building Concepts
4.936 reviews275 Main St, Watertown, MA 02472, USA
- 10View on Google
Greater Boston Contractors
4.930 reviews1309 Beacon St Ste 300, Brookline, MA 02446, USA
Ratings and reviews powered by Google
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Boston kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
The Henry Standard
Every kitchen remodeler in our network agrees to three things.
Show up
Call back. Keep appointments. And if something changes, communicate it.
Quote honestly
Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.
Finish the work
Complete every item on the scope and clean up before calling it finished.
Nothing revolutionary. Just the way we believe doing business should still be done.
How Henry matches you with Boston kitchen remodelers
- Step 1
Tell Henry about your kitchen
Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.
- Step 2
Only three pros get it
Only three Henry Standard kitchen remodelers in your Boston-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.
- Step 3
Compare up to three quotes
You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.
What kitchen remodeling costs in Boston
| Cosmetic refresh (paint, hardware, fixtures, no layout change) | $8,000–$20,000 (estimate) |
| Mid-range remodel, same layout | $30,000–$65,000 (estimate) |
| Upscale remodel with layout change | $70,000–$150,000+ (estimate) |
| Cabinet refacing | $6,000–$15,000 (estimate) |
| New cabinets (stock to semi-custom) | $12,000–$35,000 (estimate) |
| Countertops (laminate, quartz, granite, by material) | $45–$150 per sq ft installed (estimate) |
| Backsplash (tile, installed) | $20–$45 per sq ft (estimate) |
Ranges are general estimates gathered from homeowner-reported quotes in the Boston area, not an offer or a quote for your project.
When to schedule kitchen remodeling in Boston
Many Boston triple-deckers and brownstones were built before modern wiring and plumbing standards, so remodels that touch electrical or gas lines often take longer to schedule and inspect than in newer housing stock. Winter is a common time for interior remodels in Boston since exterior work slows down, which means cabinet and countertop lead times can stretch further during that peak season. Homeowners planning a spring or summer kitchen project should expect to book contractors and order materials several months ahead.
Permits and HOA rules
Boston's Inspectional Services Department (ISD) issues building, electrical, plumbing, and gas permits for construction work in the city, and any project involving those trades needs a permit before work starts. ISD distinguishes between a Short-Form Permit for minor alterations that don't change a building's structure or use and a Long-Form Permit for projects involving structural changes, layout changes, or a change in occupancy. A kitchen remodel that relocates plumbing, gas lines, or load-bearing walls is more likely to require a Long-Form Permit and plan review, while a cosmetic refresh that keeps the same footprint and fixtures in place may not need one; homeowners should confirm scope directly with ISD before starting. This hub does not list permit fees because ISD sets and updates them directly; confirm current fees on boston.gov before applying.
Licensing and insurance in Massachusetts
General contractors performing home improvement work on existing one-to-four-family, owner-occupied homes in Massachusetts must be registered with the Office of Consumer Affairs and Business Regulation's (OCABR) Home Improvement Contractor (HIC) program. Homeowners can verify a contractor's HIC registration using the MA Contractor Hub or the OCABR registration lookup before signing a contract. Any plumbing or gas-fitting work in a Boston kitchen remodel must be performed by a plumber or gas fitter licensed through the Massachusetts Board of State Examiners of Plumbers and Gas Fitters, and electrical work must be performed by an electrician licensed through the Massachusetts Board of State Examiners of Electricians; both licenses can be verified through the Massachusetts Division of Professional Licensure. Massachusetts also caps contractor deposits at one-third of the total contract price (minus the cost of custom-ordered materials) under the state's Home Improvement Contractor law, so homeowners should check that any deposit request fits within that limit before paying.
What drives kitchen remodel costs in Boston
The single biggest cost driver in a Boston kitchen remodel is whether the layout stays the same or changes. Keeping existing plumbing, gas, and electrical in place and simply updating cabinets, counters, and finishes keeps a project in the mid-range tier. Moving a sink, range, or dishwasher to a new wall means rerouting water supply, drain lines, and sometimes gas piping, which adds both material cost and the licensed trade labor needed to do it to code.
Boston's older housing stock adds its own cost factors. Many triple-deckers, brownstones, and pre-war multi-family buildings have knob-and-tube or early romex wiring, galvanized or cast-iron plumbing, and non-standard framing that can complicate a straightforward remodel. A contractor who opens a wall in a 1900s South End rowhouse may find conditions that weren't visible during the initial estimate, which is one reason a written change-order process matters before work starts.
Cabinet and countertop lead times also affect the total project cost and schedule. Semi-custom and custom cabinetry commonly takes six to twelve weeks to arrive after ordering, and stone countertop fabrication typically adds another one to three weeks after cabinets are installed and templated. Homeowners who plan around these lead times avoid the common trap of paying for rushed, in-stock substitutes.
Cosmetic refresh vs. full remodel: what changes
A cosmetic refresh keeps the kitchen's footprint, plumbing, and electrical exactly as they are. Typical scope includes repainting or refinishing existing cabinets, swapping hardware and light fixtures, replacing a countertop in the same location, and updating a backsplash. Because nothing structural or mechanical moves, this tier usually avoids triggering Long-Form Permit review from ISD, though homeowners should still confirm with the department if any electrical or plumbing fixtures are being swapped out.
A mid-range remodel with the same layout typically replaces cabinets, countertops, appliances, flooring, and lighting, but keeps the sink, range, and major fixtures in their existing locations. This tier may still require electrical or plumbing permits for fixture replacement even though the layout doesn't change, since ISD requires permits for electrical, plumbing, and gas work regardless of whether the floor plan shifts.
An upscale remodel with a layout change is the most involved and most likely to require ISD's Long-Form Permit process, especially if a wall comes down, square footage is added, or the kitchen's footprint expands into an adjacent room. These projects benefit from an architect or designer who can produce the drawings ISD needs for plan review, and homeowners should expect a longer timeline between permit application and the start of demolition.
Cabinet refacing and new cabinets: picking the right scope
Cabinet refacing keeps the existing cabinet boxes in place and replaces only the doors, drawer fronts, and hardware, with a matching veneer applied to visible box surfaces. It's a lower-cost path that works well when the existing cabinet layout and storage already function well for the household, and it typically takes less time than a full cabinet replacement.
New cabinets make sense when the layout is changing, when existing boxes are damaged or poorly built, or when a homeowner wants different storage configurations like pull-out shelving, a larger pantry cabinet, or an island. Stock cabinets ship fastest, semi-custom cabinets offer more size and finish options with a longer lead time, and fully custom cabinetry takes the longest but allows exact-fit solutions for Boston's often irregular older room dimensions.
Either path should be priced and contracted as its own line item, separate from installation labor, so homeowners can see clearly what they're paying for materials versus the work to install them.
Countertops and backsplash: material and cost tradeoffs
Countertop material has a wide cost range because it depends on stone type, slab size needed, edge profile, and whether seams are visible. Laminate sits at the lower end of the range, quartz and granite sit in the middle to upper range depending on the specific stone selected, and premium natural stone or large-format slabs push toward the top of the range. Homeowners should ask for per-square-foot material and fabrication pricing separately from installation labor.
Backsplash costs depend heavily on tile material and installation complexity. Simple subway tile in a straight running-bond pattern installs faster and cheaper than mosaic, natural stone, or patterns requiring extensive cutting around outlets and windows. Because backsplash is a smaller surface area than countertops or cabinets, it's an area where homeowners can upgrade material choice without a large total cost increase.
Payment schedules and protecting your project
Massachusetts home improvement law limits a contractor's initial deposit to one-third of the total contract price, not counting the cost of special-order materials that must be purchased upfront. Homeowners should structure the remaining payments around completed milestones, such as after demolition, after rough plumbing and electrical, after cabinet installation, and at final completion, rather than paying a large lump sum early in the project.
Every contract should spell out the full scope of work, material allowances in dollar amounts, the payment schedule tied to milestones, and a written change-order process for anything found once walls or floors are opened. Boston's older building stock makes unexpected conditions more likely than in newer construction, so a clear written process for pricing and approving changes protects both the homeowner and the contractor.
Before signing, homeowners should confirm the contractor's Home Improvement Contractor registration through the MA Contractor Hub, and confirm that any plumber, gas fitter, or electrician performing licensed trade work holds a current Massachusetts license through the state's Division of Professional Licensure boards.
Areas Henry covers
Back Bay · Beacon Hill · South End · Dorchester · Jamaica Plain · Roslindale · West Roxbury · South Boston · Charlestown · Roxbury · East Boston · Allston-Brighton
Common questions
Do I need a permit to remodel my kitchen in Boston?
It depends on scope. Boston's Inspectional Services Department requires permits for electrical, plumbing, and gas work, and requires a Long-Form Permit when a project changes a building's structure, layout, or occupancy. A cosmetic refresh that doesn't touch plumbing, gas, or electrical and keeps the same layout may not need a building permit, but homeowners should confirm directly with ISD based on their specific project scope.
Who issues kitchen remodel permits in Boston?
The Inspectional Services Department (ISD) issues building, electrical, plumbing, and gas permits for construction projects in Boston.
How do I check if a Boston kitchen remodeling contractor is properly registered?
Massachusetts requires home improvement contractors working on existing one-to-four-family owner-occupied homes to register with the Office of Consumer Affairs and Business Regulation's Home Improvement Contractor program. You can look up a contractor's registration status through the MA Contractor Hub or the OCABR registration lookup before signing a contract.
Does the plumber or electrician on my kitchen remodel need a separate license?
Yes. Plumbing and gas-fitting work must be performed by someone licensed through the Massachusetts Board of State Examiners of Plumbers and Gas Fitters, and electrical work must be performed by someone licensed through the Massachusetts Board of State Examiners of Electricians. A general contractor's HIC registration does not substitute for these trade licenses.
How much can a contractor ask for as a deposit on a Boston kitchen remodel?
Massachusetts home improvement law caps the initial deposit at one-third of the total contract price, excluding the cost of special-order materials that must be paid for upfront. The rest of the payment should be tied to completed project milestones.
Why do kitchen remodels in older Boston homes sometimes cost more than estimated?
Many Boston triple-deckers, brownstones, and other older homes have outdated wiring, plumbing, or framing that isn't visible until walls or floors are opened. A written change-order process in the contract helps homeowners and contractors agree on pricing for any conditions found once work begins.
More home services in Boston
Nearby Massachusetts markets
Get Boston kitchen remodeling estimates in writing.
Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.
Get My Free Kitchen Quotes