Kitchen remodeling companies in Charlotte, NC

Charlotte homeowners remodeling a kitchen deal with a mix of 1950s ranch homes in NoDa and Plaza Midwood, newer construction in Ballantyne and Steele Creek, and historic bungalows near Dilworth and Elizabeth, each presenting different layout and plumbing challenges. Costs and timelines vary widely depending on whether cabinets stay in place or the whole layout changes, and whether plumbing or electrical systems move. This page covers realistic pricing, Mecklenburg County permit rules, North Carolina licensing requirements, and how to plan a Charlotte kitchen remodel from scope to final inspection.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Charlotte kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 kitchen remodeling companies in Charlotte, NC

The 10 Charlotte kitchen remodeling companies with the most Google reviews.

  1. 1

    Carolina Home Remodeling

    4.81,489 reviews372 Crompton St, Charlotte, NC 28273, USA

    View on Google
  2. 2

    F2 Construction

    4.9205 reviews11111 Carmel Commons Blvd Ste 330, Charlotte, NC 28226, USA

    View on Google
  3. 3

    Complete Kitchen & Bath by Pro-Tops

    4.8176 reviews11110 E Independence Blvd, Matthews, NC 28105, USA

    View on Google
  4. 4

    Simon Quality Construction

    5.0168 reviews3131 Bank St, Charlotte, NC 28203, USA

    View on Google
  5. 5

    Queen City Kitchen and Bath

    4.7156 reviews2725 Westinghouse Blvd #400, Charlotte, NC 28273, USA

    View on Google
  6. 6

    Cransten Handyman and Remodeling

    4.8113 reviews401 N Tryon St, Charlotte, NC 28202, USA

    View on Google
  7. 7

    DGK Design and Build

    5.099 reviews9301 Monroe Rd A, Charlotte, NC 28270, USA

    View on Google
  8. 8

    ReVision Design + Build

    4.897 reviews2923 S Tryon St Ste 280, Charlotte, NC 28203, USA

    View on Google
  9. 9

    7 Day Kitchens

    5.070 reviews4715 Park Rd Ste D, Charlotte, NC 28209, USA

    View on Google
  10. 10

    Remodel CLT

    5.065 reviews205 Grandin Rd, Charlotte, NC 28208, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Charlotte kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every kitchen remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Charlotte kitchen remodelers

  1. Step 1

    Tell Henry about your kitchen

    Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard kitchen remodelers in your Charlotte-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What kitchen remodeling costs in Charlotte

Cosmetic refresh (paint, hardware, fixtures, same layout)$6,000–$15,000 (estimate)
Mid-range remodel, same layout$25,000–$45,000 (estimate)
Upscale remodel with layout change$55,000–$110,000+ (estimate)
Cabinet refacing$6,000–$12,000 (estimate)
New cabinets (stock to semi-custom)$10,000–$30,000 (estimate)
Countertops (laminate)$25–$45 per sq ft (estimate)
Countertops (quartz)$60–$120 per sq ft (estimate)
Countertops (granite)$50–$100 per sq ft (estimate)
Backsplash installation$1,200–$3,500 (estimate)

Ranges are general estimates gathered from homeowner-reported quotes in the Charlotte area, not an offer or a quote for your project.

When to schedule kitchen remodeling in Charlotte

Charlotte's remodeling calendar is shaped by humidity and demand swings rather than freeze risk. Late spring through midsummer brings high humidity that can slow drywall and paint drying times, so many contractors prefer fall and winter for interior kitchen work when conditions are more stable and scheduling is easier before the holiday rush. Booking in late summer or early fall also tends to avoid the backlog that builds up around spring home-sale season, when many Charlotte homeowners remodel ahead of listing.

Permits and HOA rules

Mecklenburg County Code Enforcement (LUESA) issues building, electrical, mechanical, and plumbing permits for Charlotte kitchen remodels under North Carolina General Statute 160D-1110. A county building permit is generally required when cabinet or layout changes alter the room's configuration, when the project cost exceeds $40,000, or when any load-bearing structure is affected; work at or under $40,000 that does not touch structural, plumbing, electrical, or mechanical systems may be exempt. A separate plumbing permit is needed to add a sink or relocate water lines (not for like-for-like fixture swaps), and a separate electrical permit is needed to add or relocate circuits or light fixtures; gas range hookups require both electrical and mechanical permits. Trade contractors performing electrical, mechanical, or plumbing work must be listed on the permit application. Confirm current requirements and any fees directly with Mecklenburg County Code Enforcement at code.mecknc.gov before starting work, since fee amounts and exemptions can change.

Licensing and insurance in North Carolina

North Carolina requires a general contractor license from the NC Licensing Board for General Contractors for any project valued at $40,000 or more, per North Carolina General Statute 87-1. Below that threshold, a license is not legally required, but homeowners can still verify any contractor's license status using the board's online lookup at nclbgc.org. Plumbing, electrical, and mechanical trade work performed as part of a kitchen remodel must be done by North Carolina-licensed trade contractors, or by an owner-occupant personally where state rules allow. Always confirm a contractor's license classification and limitation (the dollar size of project it covers) before signing a contract, since licenses are tied to specific legal entities and project value tiers.

What drives kitchen remodel costs in Charlotte

The single biggest factor in what a Charlotte kitchen remodel costs is whether the layout and the systems behind the walls change. A cosmetic refresh that keeps cabinets, plumbing, and electrical in their existing locations costs far less than a remodel that moves a sink across the room, relocates gas lines for a range, or reroutes circuits for new lighting and appliances. In older homes in neighborhoods like Elizabeth and Dilworth, remodelers often find outdated wiring or undersized plumbing that needs upgrading before new finishes go in, which adds cost that isn't always visible until walls are opened.

Cabinet and countertop choices are the next largest line items. Stock cabinets keep a budget in the mid-range tier, while semi-custom or custom cabinetry pushes a project toward the upscale tier quickly. Countertop material matters too: laminate is the most budget-friendly option, while quartz and granite carry a wide price range depending on slab selection, edge profile, and the complexity of the cutout for a sink or cooktop.

Homeowners in newer construction areas like Ballantyne and Steele Creek sometimes assume a remodel will be simpler because the home is younger, but open floor plans in these homes can mean a kitchen remodel visually affects an adjoining great room or dining area, which can expand the scope and the budget beyond the kitchen footprint itself.

Scope by area: what gets touched and what it costs

A full kitchen remodel typically breaks into distinct cost zones: cabinetry, countertops, backsplash, flooring, lighting, and appliances, plus any plumbing or electrical rework. Pricing each zone separately, as in the cost table above, gives homeowners a clearer way to compare quotes from different contractors, since one bid might include appliances and another might not.

Allowances are the dollar amounts a contractor budgets for homeowner-selected items like cabinet hardware, faucets, or light fixtures before the homeowner has chosen exact products. A written allowance of, for example, $1,500 for plumbing fixtures tells the homeowner what's included in the base price and what will cost more if they choose above that amount. Ask for allowances to be itemized by category in the contract rather than lumped into one number, so it's clear where added spending would occur.

Backsplash installation is often treated as its own line item because tile selection and labor complexity (subway tile versus mosaic, straight-set versus herringbone pattern) vary enough to swing the price significantly within the same kitchen.

Layout, plumbing, and gas moves: the main cost driver

Moving a sink, dishwasher, or gas range to a new location is consistently the largest driver of cost increases in a kitchen remodel. Relocating a drain line often means cutting into a concrete slab or crawlspace framing, and rerouting a gas line for a range or cooktop requires licensed mechanical and plumbing work plus inspection. Homeowners considering an island with a sink or cooktop should expect this to add both cost and time compared to keeping those fixtures against an existing wall.

Electrical work follows a similar pattern. Adding under-cabinet lighting, a dedicated circuit for a new range, or recessed lighting throughout the kitchen requires a licensed electrical contractor and, in most cases, an electrical permit from Mecklenburg County Code Enforcement. Same-size, same-location fixture swaps are typically simpler, but any addition to the electrical system should be priced and permitted as its own scope item.

Homeowners who want a true layout change, moving walls or reconfiguring the kitchen's footprint, should budget extra time for design and engineering if a load-bearing wall is involved, since that requires a licensed professional's review before the county will approve the permit.

Cabinet and countertop lead times

Material lead times often set the real timeline for a Charlotte kitchen remodel, more than labor availability does. Stock cabinets can sometimes be ordered and delivered within a few weeks, but semi-custom and custom cabinet lines frequently run six to twelve weeks from order to delivery, and that clock doesn't start until final measurements and selections are locked in.

Countertop fabrication for quartz or granite typically requires a template appointment after cabinets are installed, followed by one to three weeks for fabrication and installation. Homeowners who want to avoid a gap where a kitchen is unusable for weeks should ask contractors to sequence demolition so it doesn't start until cabinets and countertops are confirmed and on order, not just selected.

Special-order items like custom range hoods, specific appliance finishes, or imported tile can extend timelines further, so it's worth asking a contractor early in the quoting process which selections, if any, are likely to be on backorder.

Payment schedules and protecting against change orders

A written payment schedule tied to milestones, such as a deposit, a payment at rough-in completion, a payment at cabinet installation, and a final payment at completion and inspection sign-off, protects both the homeowner and the contractor. Negotiate a milestone schedule directly in the contract rather than paying a large deposit upfront.

Change orders should always be documented in writing before additional work begins, including the added cost and any schedule impact. This is especially important in older Charlotte homes where opening walls can reveal outdated wiring, plumbing, or moisture damage that wasn't visible during the initial quote. A clear change order process keeps a project's final cost traceable back to specific, agreed-upon decisions rather than verbal add-ons.

Homeowner Henry's model is built around this kind of clarity: three local pros review the project request, and each one that responds agrees to show up, quote honestly in writing, and finish the work, which gives homeowners a baseline for comparing bids on the same terms.

Working with Charlotte's permit and inspection process

Once a kitchen remodel's scope is set, the contractor (or homeowner, if self-performing where allowed) applies for the relevant permits through Mecklenburg County Code Enforcement, which is also where inspections are scheduled as work progresses. A remodel that stalls partway through needs to keep inspections moving so the permit stays active.

For projects that involve several trades, electrical, plumbing, mechanical, and building, each trade typically needs its own permit and its own inspection before the next phase of work can proceed. Homeowners should ask their general contractor which permits apply to their specific scope and request copies of the permit numbers once issued, since that documentation matters later for resale and for any warranty or insurance claims tied to the work.

Areas Henry covers

Dilworth · Elizabeth · NoDa · Plaza Midwood · Myers Park · South End · Ballantyne · Steele Creek · University City · Cotswold

Common questions

Do I need a permit for a kitchen remodel in Charlotte?

It depends on the scope. Mecklenburg County generally requires a building permit when cabinet or layout changes alter the kitchen's configuration, when the project costs more than $40,000, or when load-bearing structure, plumbing design, or electrical or mechanical systems are added or changed. Confirm your specific project with Mecklenburg County Code Enforcement before starting.

Does my kitchen remodel contractor need to be licensed in North Carolina?

A general contractor license from the NC Licensing Board for General Contractors is required by law for any project valued at $40,000 or more. Below that amount, state licensing isn't required, but you can still verify a contractor's license at nclbgc.org. Plumbing, electrical, and mechanical trade work must be done by North Carolina-licensed trade contractors regardless of overall project cost.

How long does a kitchen remodel take in Charlotte?

Timelines vary with scope, but cabinet and countertop lead times are often the biggest factor. Stock cabinets can arrive in a few weeks, while semi-custom or custom cabinets commonly take six to twelve weeks, with countertop fabrication adding one to three more weeks after templating.

Can I do some of the work myself to save money?

North Carolina allows an owner-occupant to perform certain work personally, but electrical, plumbing, and mechanical work still needs to meet code and pass inspection. Check with Mecklenburg County Code Enforcement about what qualifies before planning to self-perform any portion of the job.

What's the best time of year to remodel a kitchen in Charlotte?

Many homeowners schedule interior kitchen work for fall and winter, when humidity is lower and drying times for paint and drywall are more predictable, and before the spring home-sale season creates a scheduling backlog with contractors.

Sources

Get Charlotte kitchen remodeling estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Kitchen Quotes