Kitchen remodeling companies in Pittsburgh, PA
Pittsburgh's kitchen remodels range from a weekend-friendly cosmetic refresh in a Lawrenceville rowhouse to a full layout change in a Squirrel Hill colonial. Costs below are local estimates only, and actual quotes depend on your home's age, layout, and whether plumbing or gas lines need to move.
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Pittsburgh kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
Top 10 kitchen remodeling companies in Pittsburgh, PA
The 10 Pittsburgh kitchen remodeling companies with the most Google reviews.
- 1View on Google
Legacy Remodeling
4.9286 reviews3090 W Liberty Ave, Pittsburgh, PA 15216, USA
- 2View on Google
J. Francis Company LLC
4.8148 reviews1410 High St, Pittsburgh, PA 15212, USA
- 3View on Google
Premiere Kitchen & Bath
4.8112 reviews106 Rockwood Ave, Pittsburgh, PA 15221, USA
- 4View on Google
Enlightened Remodeling
5.0100 reviews5877 Commerce St Site 101, Pittsburgh, PA 15206, USA
- 5View on Google
Romero Remodeling Company LLC
4.690 reviews108 Cherry St, Pittsburgh, PA 15223, USA
- 6View on Google
Marvista Design + Build
4.785 reviews2435 Beechwood Blvd, Pittsburgh, PA 15217, USA
- 7View on Google
Pittsburgh's Best Remodeling - Wexford
4.978 reviews120 Lake Dr, Wexford, PA 15090, USA
- 8View on Google
AKN Interiors
5.078 reviews2942 Industrial Blvd, Bethel Park, PA 15102, USA
- 9View on Google
Bradford Renovations Pittsburgh
4.975 reviews1001 McKee St Suite 100, McKees Rocks, PA 15136, USA
- 10View on Google
Pittsburgh's Best Remodeling - South
4.864 reviews501 Castle Shannon Blvd, Pittsburgh, PA 15234, USA
Ratings and reviews powered by Google
Skip the 10 phone calls.
Tell Henry about your project once and get up to 3 written estimates from local Pittsburgh kitchen remodeling companies.
Get 3 free estimatesAlready have an estimate? Get a free second opinion
The Henry Standard
Every kitchen remodeler in our network agrees to three things.
Show up
Call back. Keep appointments. And if something changes, communicate it.
Quote honestly
Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.
Finish the work
Complete every item on the scope and clean up before calling it finished.
Nothing revolutionary. Just the way we believe doing business should still be done.
How Henry matches you with Pittsburgh kitchen remodelers
- Step 1
Tell Henry about your kitchen
Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.
- Step 2
Only three pros get it
Only three Henry Standard kitchen remodelers in your Pittsburgh-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.
- Step 3
Compare up to three quotes
You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.
What kitchen remodeling costs in Pittsburgh
| Cosmetic refresh (paint, hardware, backsplash, fixtures) | $6,000–$16,000 per kitchen |
| Mid-range remodel, same layout | $25,000–$50,000 per kitchen |
| Upscale remodel with layout change | $55,000–$120,000+ per kitchen |
| Cabinet refacing | $5,000–$12,000 per kitchen |
| New cabinets, mid-grade to custom | $8,000–$30,000+ per kitchen |
| Countertops, laminate | $25–$45 per sq ft installed |
| Countertops, quartz or granite | $60–$120 per sq ft installed |
| Backsplash, tile | $20–$45 per sq ft installed |
Ranges are general estimates gathered from homeowner-reported quotes in the Pittsburgh area, not an offer or a quote for your project.
When to schedule kitchen remodeling in Pittsburgh
Pittsburgh's older housing stock (many pre-1978 homes in neighborhoods like Lawrenceville, Bloomfield, and the South Side) means lead-safe work practices often apply when cabinets or walls are disturbed. Contractors book up heading into fall and winter when homeowners move interior projects indoors after exterior-season work wraps, so lead times for cabinets and countertops can stretch several weeks longer from late summer through early winter.
Permits and HOA rules
In Pittsburgh, most kitchen remodels involving structural changes, electrical, mechanical, or layout alterations go through the City's Permits, Licenses and Inspections (PLI) department via the Building and Development Application (BDA), which combines building permit and zoning review into one application. Plumbing permits for the city are handled separately by the Allegheny County Health Department's Plumbing Division, not PLI. Purely cosmetic work like painting, cabinet refacing, or swapping fixtures in place typically does not require a permit, but moving walls, gas lines, electrical circuits, or plumbing generally does; confirm your specific scope with PLI before starting, and never assume a fee amount since PLI sets and updates fee schedules itself.
Licensing and insurance in Pennsylvania
Pennsylvania does not issue a statewide general contractor license, but any contractor performing more than $500 of home improvement work on a residence must register with the PA Office of Attorney General under the Home Improvement Consumer Protection Act (HICPA). Registered contractors are issued a PA contractor number that must appear on their ads, contracts, and estimates, and homeowners can verify a contractor's registration status through the Attorney General's online HIC search tool. If your remodel involves new electrical circuits, licensed electricians performing that work in Pittsburgh need to meet the city's electrical permitting requirements, and any gas line work should go through a licensed plumber given the county handles plumbing permits separately.
What drives kitchen remodel costs in Pittsburgh
The single biggest cost driver in most Pittsburgh kitchen remodels is whether the layout changes. Keeping the sink, stove, and refrigerator in their existing footprint keeps plumbing and gas lines untouched, which is a major reason a mid-range same-layout remodel can run well under half the cost of a layout change that relocates a gas range or moves a sink to an island.
Pittsburgh's housing stock adds its own wrinkle. Many kitchens in neighborhoods like Lawrenceville and the South Side sit in homes built before 1978, which means lead-safe work practices may apply any time walls, cabinets, or trim are disturbed, and that can add both time and cost compared to a newer-construction kitchen in a suburb built after that threshold.
Cabinet and countertop lead times are the other factor homeowners consistently underestimate. Custom or semi-custom cabinets frequently take six to twelve weeks to arrive after ordering, and stone countertop templating and fabrication typically adds another one to two weeks after cabinets are installed, so the total project calendar is usually longer than the installation labor alone suggests.
Scope by area: what's actually in a kitchen remodel line item
A cosmetic refresh generally covers paint, cabinet hardware, a new backsplash, updated light fixtures, and sometimes a new sink and faucet, all without touching the layout or utilities. This is the fastest tier and the one least likely to require a permit in Pittsburgh.
A mid-range same-layout remodel usually adds new cabinets or a full refacing, new countertops, new flooring, and updated appliances, all installed in the existing floor plan. Because the sink and range stay put, plumbing and gas work is typically limited to hookups rather than rerouting lines.
An upscale remodel with a layout change is where island additions, removed walls, relocated plumbing or gas lines, and electrical panel upgrades show up. This tier is also the one most likely to trigger a full Building and Development Application with the City of Pittsburgh, since structural and utility changes fall squarely within PLI's permit scope.
Allowances, change orders, and what to put in writing
Most kitchen remodel contracts in the Pittsburgh market use allowances for cabinets, countertops, and appliances rather than locking in exact product costs upfront, since homeowners often haven't finalized selections before signing. A written allowance should state the dollar amount budgeted for each category so you know exactly what happens to the price if you choose something above or below that number.
Under Pennsylvania's Home Improvement Consumer Protection Act, home improvement contracts above the law's thresholds must include specific terms, and contractors are required to put their state registration number on every contract and estimate, which gives homeowners a straightforward way to confirm they're dealing with a registered business before signing anything.
Any change to the original scope, whether it's an upgraded countertop or a plumbing line that needs to move once a wall comes down, should be documented as a signed change order with the price difference spelled out before the work happens, not settled verbally mid-project.
Payment schedules and protecting your deposit
Kitchen remodel contracts in Pittsburgh typically use milestone-based payment schedules tied to project phases such as demolition, rough-in, cabinet installation, and final punch list, rather than a single payment at signing or completion. Spreading payments across milestones gives both the homeowner and contractor a way to track progress against cash paid.
Pennsylvania's Home Improvement Consumer Protection Act includes specific requirements around contract terms for home improvement work, which is one more reason to get the full payment schedule, start date, and completion estimate in writing before any deposit changes hands, rather than relying on a verbal understanding.
If a kitchen remodel stalls because of a cabinet backorder or a permit delay with PLI, a clear written schedule tied to milestones rather than calendar dates makes it easier to see which payments are actually due and which should wait until the corresponding work is complete.
Permits and inspections for a Pittsburgh kitchen project
The City of Pittsburgh reviews most construction work, including kitchen remodels that touch structure, electrical, or mechanical systems, through PLI's Building and Development Application process, which replaced the separate building permit and zoning review applications homeowners used to file individually.
Plumbing is the exception: plumbing permits inside the City of Pittsburgh are issued by the Allegheny County Health Department's Plumbing Division rather than PLI, so a kitchen remodel that relocates a sink or adds a gas line for a range may involve coordinating with both the city and the county depending on the exact scope.
Because permit requirements depend on the specific scope of your remodel, and PLI itself notes it can make case-by-case determinations, the most reliable step before demolition day is confirming directly with PLI whether your particular layout change, electrical addition, or structural work needs a permit, rather than assuming based on a neighbor's project.
Verifying who you hire
Since Pennsylvania doesn't license general contractors at the state level, the main verification step for a Pittsburgh homeowner is confirming HICPA registration through the Attorney General's online search tool, which shows active registrations and the contractor's assigned PA number.
HICPA registration is a legal requirement for anyone doing more than $500 of home improvement work on a residence, not a quality endorsement, so it confirms a contractor is operating within the law rather than vouching for their craftsmanship.
If your remodel includes new electrical work, confirm that the licensed electrician performing it is pulling the correct permit with the City of Pittsburgh, and if it includes gas or plumbing line changes, confirm that work is going through a properly credentialed plumber and the Allegheny County Health Department's plumbing permit process.
Areas Henry covers
Squirrel Hill · Shadyside · Lawrenceville · Bloomfield · South Side Slopes · Highland Park · Brookline · Regent Square · Point Breeze · Mount Washington
Common questions
Do I need a permit to remodel my kitchen in Pittsburgh?
It depends on scope. Purely cosmetic work like painting, refacing cabinets in place, or swapping a faucet typically doesn't require a permit, but moving walls, adding electrical circuits, or relocating gas or plumbing lines generally falls under PLI's Building and Development Application process. Confirm your specific project with PLI before starting.
Who handles plumbing permits for a kitchen remodel in Pittsburgh?
Plumbing permits within the City of Pittsburgh are issued by the Allegheny County Health Department's Plumbing Division, separately from the city's PLI building permits, so a kitchen project that moves a sink or adds gas lines may need to go through both agencies.
Does Pennsylvania license kitchen remodeling contractors?
Pennsylvania doesn't have a statewide general contractor license. Instead, contractors doing more than $500 of home improvement work on a residence must register with the state Attorney General's office under the Home Improvement Consumer Protection Act and display their registration number on contracts and ads.
How can I check if a contractor is registered in Pennsylvania?
The PA Office of Attorney General runs a free online Home Improvement Contractor search tool where you can look up active registrations by name or registration number before signing a contract.
Why do older Pittsburgh homes add cost to a kitchen remodel?
Many homes in neighborhoods like Lawrenceville, Bloomfield, and the South Side predate 1978, so disturbing walls, trim, or cabinets can trigger lead-safe work practice requirements, which adds containment steps and time compared to newer construction.
What's the biggest cost driver in a Pittsburgh kitchen remodel?
Whether the layout changes. Keeping the sink, range, and refrigerator in their existing locations avoids moving plumbing and gas lines, which is usually the largest cost difference between a mid-range remodel and an upscale remodel with a new layout.
How long do cabinets and countertops take to arrive once ordered?
Semi-custom or custom cabinets commonly take six to twelve weeks after ordering, and stone countertops typically add another one to two weeks for templating and fabrication after cabinets go in, so the full project calendar usually runs longer than the installation labor itself.
More home services in Pittsburgh
Nearby Pennsylvania markets
Get Pittsburgh kitchen remodeling estimates in writing.
Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.
Get My Free Kitchen Quotes