Kitchen remodeling companies in Vancouver, WA

A kitchen remodel in Vancouver, Washington ranges from a quick cabinet-and-counter refresh to a full layout overhaul with moved plumbing and gas lines, and costs vary widely across neighborhoods from Hazel Dell bungalows to new builds near Cascade Park. This hub covers realistic Clark County-area pricing, the permit and licensing facts specific to Vancouver, and what to expect from a well-run project from first quote to final walkthrough. Henry's approach here is simple: three local pros get your request, each agrees to show up, quote honestly in writing, and finish the work.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Vancouver kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 kitchen remodeling companies in Vancouver, WA

The 10 Vancouver kitchen remodeling companies with the most Google reviews.

  1. 1

    JDI Construction

    4.9211 reviews1419 Broadway St, Vancouver, WA 98663, USA

    View on Google
  2. 2

    Romanovich Construction

    5.0153 reviews19811 NE 99th Ct, Battle Ground, WA 98604, USA

    View on Google
  3. 3

    Paliy Renovation

    5.0146 reviews5305 NE 121st Ave Ste J312, Vancouver, WA 98682, USA

    View on Google
  4. 4

    HAAGEN GENERAL CONTRACTORS LLC

    4.9143 reviews13600 NE 18th St Apt 25, Vancouver, WA 98684, USA

    View on Google
  5. 5

    Serden Group LLC

    5.0137 reviews1104 Main St, Vancouver, WA 98660, USA

    View on Google
  6. 6

    KC Remodeling

    4.8125 reviews3908 E 15th St, Vancouver, WA 98661, USA

    View on Google
  7. 7

    Amplified Renovations

    5.0123 reviews720 SE 160th Ave Ste 103 pmb 207, Vancouver, WA 98684, USA

    View on Google
  8. 8

    VMR Custom

    5.0111 reviews13706 NE 28th St #13, Vancouver, WA 98682, USA

    View on Google
  9. 9

    Prestige Construction & Home Remodeling

    4.996 reviews3218 NE 157th Ave, Vancouver, WA 98682, USA

    View on Google
  10. 10

    Salcans Remodeling

    5.078 reviews4226 NE 62nd Ave, Vancouver, WA 98661, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Vancouver kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every kitchen remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Vancouver kitchen remodelers

  1. Step 1

    Tell Henry about your kitchen

    Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard kitchen remodelers in your Vancouver-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What kitchen remodeling costs in Vancouver

Cosmetic refresh (paint, hardware, fixtures, same layout)$8,000–$18,000
Mid-range remodel, same layout$25,000–$50,000
Upscale remodel with layout change$55,000–$120,000+
Cabinet refacing$6,000–$14,000
New custom/semi-custom cabinets$12,000–$35,000
Countertops – laminate$1,200–$3,000
Countertops – quartz$3,500–$8,000
Countertops – granite$3,000–$7,500
Backsplash installation$900–$3,000

Ranges are general estimates gathered from homeowner-reported quotes in the Vancouver area, not an offer or a quote for your project.

When to schedule kitchen remodeling in Vancouver

Vancouver's remodeling season tends to peak in spring and early summer when homeowners plan projects around the Pacific Northwest's drier months, which also means longer scheduling waits with reputable contractors from April through August. Winter is the slower season and often brings more flexible scheduling and sometimes better material pricing, since fewer households want construction dust during the rainy months. Regardless of season, cabinet and countertop lead times (often four to ten weeks depending on the product) usually determine the project timeline more than weather does.

Permits and HOA rules

Most kitchen remodels in the City of Vancouver require a Residential Building Permit (RES) whenever the project involves moving walls, changing the footprint, or altering plumbing, gas, or electrical systems; purely cosmetic work like painting or swapping countertops without plumbing changes typically does not need one. Permit applications go through the City's ePlans online system, and applicants submit a completed Residential Building Permit application along with plans showing the proposed floor plan, plumbing fixtures, and any structural changes. The City does not issue electrical permits directly; those go through Washington's Department of Labor & Industries, while plumbing and mechanical permits are applied for through the City's online Permit Center. Homeowners just outside Vancouver city limits but still in unincorporated Clark County apply through the Clark County Permit Center instead, which requires an appointment for in-person services and uses its own ePlan review system. Always confirm with the relevant permit office which jurisdiction covers your address before applying, since city and county boundaries can be easy to misjudge near the edges of Vancouver.

Licensing and insurance in Washington

Washington State requires all construction contractors, including kitchen remodelers, to register with the Department of Labor & Industries (L&I) before they can legally bid, advertise, or perform work; operating unregistered carries real penalties. General contractors must carry a $30,000 surety bond (or assigned savings) and specialty contractors a $15,000 bond, along with general liability insurance, before L&I will issue or renew a registration. If your remodel involves moving gas lines or relocating plumbing fixtures, that work must be performed by a plumber meeting L&I's plumbing certification requirements, and most electrical work in a kitchen remodel requires an L&I-licensed electrical contractor and a separate electrical permit through L&I rather than the city. Before signing any contract, homeowners can verify a contractor's registration, bond, and insurance status directly through L&I's free online lookup tool. Washington does not set a legal cap on contractor deposits, but L&I and the state Attorney General's office advise homeowners to avoid paying more than about 10% of the contract price (or roughly $1,000) up front, whichever is less, and to tie the rest of payment to completed milestones.

What drives the cost of a kitchen remodel in Vancouver

Scope by area matters more than square footage alone. A small galley kitchen in a Hough bungalow with original 1920s-era plumbing can cost more to remodel per square foot than a larger, newer kitchen in Felida simply because of what's behind the walls.

The single biggest cost driver in most Vancouver kitchen remodels is a layout or plumbing/gas change. Moving a sink, range, or dishwasher even a few feet means rerouting supply lines, drains, and sometimes gas piping, which adds both material cost and extra inspections beyond the base remodel.

Allowances are the dollar amounts set aside in a contract for items you'll pick later, such as $3,500 for a range, $2,000 for a faucet and sink, or $6,000 for lighting fixtures. If your final selections exceed the allowance, that difference becomes a change order, so it's worth shopping early for big-ticket items before signing.

Cabinet and countertop lead times

Stock cabinets from a big-box retailer can sometimes arrive in two to three weeks, but semi-custom and custom cabinet lines commonly run six to ten weeks from order to delivery, and that clock doesn't start until final measurements and selections are locked in.

Countertop fabrication typically can't begin until cabinets are installed, since templating happens on-site after the boxes are set. Expect another one to three weeks after templating for quartz or granite to be cut and installed, so cabinet delays cascade directly into countertop delays.

Payment schedules and change orders

A fair milestone schedule for a mid-range Vancouver kitchen remodel typically looks like a modest deposit at signing, a payment when cabinets are ordered, another after rough plumbing and electrical pass inspection, one after cabinet installation, and a final payment held until the punch list is complete.

Washington law doesn't cap contractor deposits by statute, but contracts over $1,000 must be in writing and include a payment schedule, so insist on seeing that schedule in the contract itself rather than agreeing to it verbally.

Every change to the original scope, whether it's upgrading a countertop slab or adding a pot filler, should be documented as a written change order with the added cost and any schedule impact spelled out before the work happens, not after.

What a mid-range remodel typically includes

A mid-range, same-layout remodel usually covers new cabinets or a cabinet refacing, new countertops, a tile or stone backsplash, updated lighting, and replacing the sink and faucet, all without moving plumbing or structural walls.

Flooring is often bundled into this tier as well, since kitchen remodels frequently expose subfloor conditions once old cabinetry and appliances are removed, and repairing or leveling that subfloor is a common source of unplanned cost.

When a layout change makes sense

Removing a wall between the kitchen and a dining or living space is popular in older Vancouver homes in neighborhoods like Arnada and Hough, but it almost always requires a structural engineer's review if the wall is load-bearing, which adds cost and time to permitting.

An island addition that includes a sink or cooktop counts as a plumbing or gas move even if the rest of the kitchen footprint stays the same, so it's worth treating it as a layout-change-tier project for budgeting purposes.

Questions to ask before you sign

Ask each Vancouver remodeler to list, in writing, which parts of the job need a City or Clark County permit, who pulls each one, and which inspections have to pass before drywall goes back up. A contractor who is vague about who handles the L&I electrical permit is a contractor worth a second look.

Ask for the cabinet line, door style and countertop material written into the quote, not just a dollar total. Two quotes that look $8,000 apart are often quoting different cabinet tiers, and naming the products is the only way to compare them fairly.

Ask how the crew will keep part of the house usable during the work, such as a temporary sink or a spot for the refrigerator, and how long the kitchen will be fully out of service. In a typical same-layout remodel that stretch runs several weeks, and knowing it up front helps you plan.

Red flags in a kitchen quote

Watch for a quote that asks for most of the money before cabinets are even ordered, a contractor who can't give an L&I registration number, or a bid that leaves out permits entirely on a job that moves plumbing or gas.

Be wary of "today only" package pricing or pressure to sign the same day. A fair Vancouver remodeler will leave a written quote and give you time to compare it with others.

Areas Henry covers

Hazel Dell · Cascade Park · Fisher's Landing · Hough · Arnada · Walnut Grove · Felida · Burton

Common questions

Do I need a permit to remodel my kitchen in Vancouver, WA?

If you're changing plumbing, gas, electrical, or the structure (like removing a wall), yes, you'll need a Residential Building Permit through the City of Vancouver's ePlans system. Purely cosmetic work like painting cabinets or swapping a countertop without moving plumbing generally doesn't require one.

Who handles electrical permits for a Vancouver kitchen remodel?

The City of Vancouver does not issue electrical permits directly. Electrical permits for kitchen work go through the Washington State Department of Labor & Industries.

Is my address in the City of Vancouver or unincorporated Clark County?

Boundaries can be easy to misjudge near the edges of the city. Check with the relevant permit office, City of Vancouver or the Clark County Permit Center, before applying, since each jurisdiction handles its own permitting.

Does Washington State cap how much deposit a contractor can charge?

No, Washington doesn't set a legal cap on deposits, but state guidance recommends keeping the upfront deposit small, around 10% of the contract or roughly $1,000, and tying the rest of payment to completed milestones.

How do I check if a contractor is properly registered in Washington?

Every construction contractor must register with the Department of Labor & Industries and carry a surety bond and liability insurance. You can verify a contractor's registration, bond, and insurance status through L&I's free online lookup before signing a contract.

What usually takes the longest in a kitchen remodel timeline?

Cabinet and countertop lead times are usually the longest stretch, often six to ten weeks for semi-custom cabinets plus additional time for countertop templating and fabrication after cabinets are installed.

How much does a backsplash typically cost in Vancouver?

A standard tile backsplash installation typically runs $900 to $3,000 depending on material and square footage, separate from countertop or cabinet costs.

Get Vancouver kitchen remodeling estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Kitchen Quotes