Roof Replacement Cost in San Antonio, TX (2026): Shingle, Tile, and Metal

Roofs in San Antonio die of two things: hail and heat. Both shorten the useful life well below what the shingle wrapper promises, which is why a 30-year product here is realistically an 18-to-22-year roof. When it is time to replace, the decisions that matter most are the covering, the impact rating and the ventilation — not the brand on the truck.

By Jason Green · Roofing & Gutters · Published August 12, 2026 · 9 min read

Roofers in San Antonio, TX

What a new roof costs in 2026

Architectural asphalt shingle on a typical 2,000 square foot roof runs $10,500 to $18,000 installed, including tear-off, synthetic underlayment, ice-and-water in the valleys, new boots, drip edge and disposal. Clay or concrete tile runs $25,000 to $50,000; standing-seam metal $24,000 to $46,000.

Decking is the usual surprise. Rotten or sagging sheathing has to be replaced at $85 to $150 per sheet, and a bid without a per-sheet price is leaving that number open.

Class 4 impact-resistant shingles in hail alley

Bexar County sits in a heavy hail corridor, and Class 4 impact-rated shingles resist the bruising that gets ordinary shingles condemned. The upgrade runs $1,500 to $3,500 on a typical roof.

Most Texas carriers offer a wind-and-hail premium discount for a Class 4 roof — often 10% to 30% of that portion of your premium. Call your agent for the actual number before you decide; on many San Antonio homes the discount pays back the upgrade within the life of the roof, and it also reduces the odds of needing a claim at all.

Ventilation is not an upsell here

Attic temperatures over 140 degrees cook shingles from the underside and drive up cooling costs. Many older San Antonio homes are under-ventilated, and replacing a roof without fixing that shortens the new one.

Ask for balanced intake and exhaust — continuous soffit intake paired with ridge vent — priced as a line item. It is a small share of the total and it is the cheapest thing you can do for the life of the roof.

Choosing the covering

Shingle is the default and the value option, at 18 to 22 realistic years in this heat. Tile suits the Spanish and Mediterranean stock across Alamo Heights and the north side, lasts 30 to 50 years and handles the sun beautifully, but needs a crew experienced with underlayment beneath tile — the underlayment fails long before the tile does.

Metal costs more up front, lasts 40 to 60 years, reflects heat well and can earn its own insurance treatment. On a home you intend to keep, run the arithmetic over 30 years rather than over the invoice.

Typical cost ranges

Architectural shingle, 1,500 sq ft roof$8,200 - $13,500
Architectural shingle, 2,000 sq ft roof$10,500 - $18,000
Architectural shingle, 3,000 sq ft roof$15,500 - $26,000
Class 4 impact-resistant upgradeadd $1,500 - $3,500
Clay or concrete tile$25,000 - $50,000
Standing-seam metal roof$24,000 - $46,000

Ranges are general estimates gathered from homeowner-reported quotes, not an offer or a quote for your project.

Common questions

How long does a roof last in San Antonio?

Eighteen to twenty-two years for architectural shingle, shorter with poor attic ventilation or repeated hail. Tile and metal run 30 to 60 years.

Are Class 4 shingles worth it in San Antonio?

Usually. The $1,500 to $3,500 upgrade resists hail bruising and most Texas carriers give a wind-and-hail premium discount — ask your agent for the specific credit.

Who pulls the permit?

Your contractor, through San Antonio Development Services. A roofer asking you to pull an owner permit is shifting liability to you.

Want real numbers for your own project?

Two minutes now beats weeks of unreturned calls. Free, no obligation, never more than three roofers.

Get My Free Roofing Quotes

More on this market

Local cost ranges, seasons, permits and licensing for this city live on the market page.

Roofers in San Antonio, TX

The Henry Standard

Every roofer in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Clear scope, materials, and pricing in writing—so you know what you're agreeing to.

Finish the work

See the job through and take care of the agreed-upon work before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.