Roofers in Savannah GA: How to Hire the Right One

When hiring roofers in Savannah, GA, start by verifying their license on the Georgia Secretary of State's contractor lookup, since Georgia has no separate roofing license and residential roofers work under the state's general residential/specialty contractor rules. Expect full reroofs in the metro to run roughly $9,500 to $17,000 for asphalt shingle homes, more for metal or historic properties. This guide covers how to vet a roofer's credentials, what questions to ask on the phone, and how local pricing and payment norms work here.

By Jason Green · Roofing & Gutters · Published September 4, 2026 · 8 min read

Roofers in Savannah, GA

Checking credentials before you call anyone back

Georgia does not license roofing as its own trade; most residential roofers operate as licensed Residential Contractors or as limited specialty contractors under O.C.G.A. 43-41-17, overseen by the Secretary of State's State Licensing Board for Residential and General Contractors. Look up any license number directly on the Secretary of State's website before scheduling an estimate, and ask for their current general liability insurance certificate and, if they have employees, workers' compensation coverage.

Because Savannah and Chatham County also require a local business/occupation tax certificate, a legitimate local roofer should be able to produce that too, not just a state license number. If a company can't produce any of these on request, that is a real red flag, not a technicality, and it's a reasonable reason to move on to the next name on your list.

It's also worth asking how long the company has actually worked in coastal Georgia specifically, since a roofer who mostly works inland Georgia jobs may not be as familiar with the fastening schedules and wind-borne debris considerations that apply in Chatham County.

What roofers charge in the Savannah metro

A standard asphalt shingle reroof on a home in Southside, Georgetown, or Pooler typically runs $9,500 to $17,000 depending on square footage, pitch, and how much decking needs replacing. Homes in Ardsley Park and other older neighborhoods with steeper or more complex rooflines tend to land at the higher end because of the extra cutting, flashing detail, and labor time those roof shapes require.

Deposits in this market are typically 10 to 30 percent of the job total, with the balance due at completion or split at material delivery and completion; be cautious of any roofer asking for more than a third up front. A payment schedule tied to milestones (deposit, materials on site, completion) protects both sides better than a single lump sum paid before work starts.

Metal roofing and Historic District material-matched work cost significantly more, since both require specialty materials and, in the Historic District, board review before the job can even be scheduled. Ask for the total installed price, not just a per-square-foot number, since coastal wind-code fastening adds labor that a generic quote may not reflect, and two quotes with the same per-square-foot number can still differ by thousands once decking repair and fastening detail are factored in.

Questions to ask before signing

Ask who pulls the City of Savannah or Chatham County permit and confirm it will be filed before work starts, not after. Ask whether the contract distinguishes a workmanship warranty (covering installation errors, typically 2-10 years from the roofer) from the manufacturer's material warranty (typically 25-50 years, prorated), since these are not the same thing and homeowners are often surprised by that gap.

Ask how the crew handles fastener corrosion resistance given the coastal salt air, and whether they use ring-shank or coated fasteners rather than standard ones. Ask what happens if hidden decking damage is found once tear-off starts, and get the per-sheet replacement cost in writing up front so there's no surprise change order mid-project.

Get at least two other written bids and compare them line by line: same square footage, same underlayment type, same warranty terms, not just the bottom-line number. A quote that's dramatically lower than the others usually means a shortcut somewhere, whether that's thinner underlayment, fewer fasteners, or reused flashing.

It also helps to ask a prospective roofer how they price change orders if hidden decking rot is found once the old shingles come off, since this is one of the most common sources of a final bill that's higher than the original quote. A fair roofer sets a per-sheet price for replacement decking in the contract itself rather than negotiating it on the spot.

Consider asking for local references specifically in your neighborhood; a roofer who has worked recently in Ardsley Park or Isle of Hope will know the typical roof pitch, decking age, and access challenges of homes there, which can make the estimate more accurate the first time.

Finally, ask about cleanup and debris removal, including whether a magnetic sweep for nails is included, since a full tear-off leaves a lot of loose fasteners in the yard that can cause flat tires or injuries if not properly cleared.

Once you've got a shortlist, Homeowner Henry's free matching tool can connect you with vetted roofers serving Savannah and link back to the city's roofing hub for permit and licensing specifics before you commit to anyone.

The reroof timeline, step by step

A typical Savannah asphalt shingle reroof runs one to three days of on-site work once it starts, but the full process from signed contract to finished roof usually spans three to six weeks: the contractor first pulls the City of Savannah or Chatham County permit, which the city's eTRAC portal can process in a matter of days for a straightforward like-for-like reroof, then orders materials, which for standard architectural shingle is typically in stock, while custom colors or metal panels can add one to three weeks of lead time.

On installation day, the crew tears off the old roofing down to the decking, inspects for rot or delamination, replaces any damaged plywood at the pre-agreed per-sheet rate, installs synthetic underlayment (increasingly standard over older felt in coastal Georgia because it holds up better to humidity exposure during construction), then ice-and-water shield or self-adhering membrane at eaves and valleys, drip edge, shingles, and ridge cap, followed by a magnetic nail sweep and site cleanup.

A final inspection, either a City of Savannah or Chatham County building inspector's sign-off or the contractor's own quality check depending on permit requirements, should happen before final payment changes hands; ask up front whether the contract ties the last payment to a passed inspection rather than just substantial completion of the visible work. Weather is the biggest variable in Savannah specifically: a contractor should have a plan for an approaching afternoon thunderstorm mid-tear-off, since an exposed deck caught in a sudden downpour is a real risk during the region's frequent summer storm pattern.

Financing and payment schedule norms

Beyond straightforward cash payment, many Savannah roofing companies partner with third-party lenders offering promotional 0% financing for 12 to 18 months or longer-term loans stretching 5 to 12 years at fixed rates, which can make a $15,000 reroof manageable as a monthly payment rather than a lump sum; always ask for the specific APR after any promotional period ends, since deferred-interest plans can charge back interest to day one if the balance isn't paid off in time.

Homeowners insurance-funded reroofs following storm damage work differently: the insurer typically pays in two installments, an initial actual cash value payment followed by depreciation recoverable once the work is complete and an invoice is submitted, so a homeowner should confirm with both the insurer and the roofer how that second payment gets coordinated rather than assuming the roofer will simply wait for it.

Whatever the payment method, a fair Savannah contract still ties progress payments to milestones, deposit at signing, a payment when material is delivered or tear-off begins, and the final balance only after the work passes inspection, and a roofer unwilling to structure payment that way, insisting instead on full payment before the crew even shows up, is a red flag regardless of how the job is being financed.

Typical cost ranges

Asphalt shingle reroof (1,500-2,200 sf)$9,500 - $17,000
Steep/complex roofline surcharge+$1,500 - $4,000
Standard deposit10% - 30% of total
Decking replacement (per sheet)$75 - $150
Roof inspection before hiring$150 - $450

Ranges are general estimates gathered from homeowner-reported quotes, not an offer or a quote for your project.

Common questions

How do I verify a roofer's license in Savannah GA?

Use the Georgia Secretary of State's online license lookup for Residential and General Contractors, since Georgia does not have a separate roofing license category.

How much does a new roof cost in Savannah?

A typical asphalt shingle reroof runs $9,500 to $17,000, with metal and historic-material jobs costing more.

What deposit should I pay a Savannah roofer?

10 to 30 percent of the total job cost is standard; be wary of requests for more than a third upfront.

Do Savannah roofers need to pull a permit for a full reroof?

Yes, a building permit is required through the City of Savannah's Development Services Department or Chatham County's permitting office for unincorporated areas.

What's the difference between a workmanship warranty and a manufacturer warranty?

A workmanship warranty covers installation errors and is offered by the roofer, usually 2-10 years; a manufacturer warranty covers material defects and often runs 25-50 years, sometimes prorated.

Want real numbers for your own project?

Two minutes now beats weeks of unreturned calls. Free, no obligation, never more than three roofers.

Get My Free Roofing Quotes

More on this market

Local cost ranges, seasons, permits and licensing for this city live on the market page.

Roofers in Savannah, GA

The Henry Standard

Every roofer in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Clear scope, materials, and pricing in writing—so you know what you're agreeing to.

Finish the work

See the job through and take care of the agreed-upon work before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.