Kitchen remodeling companies in Indianapolis, IN

Indianapolis homeowners remodel kitchens in everything from Meridian-Kessler bungalows to newer builds on the city's edges, and the right scope depends heavily on whether the layout, plumbing, or gas lines move. This hub covers realistic cost ranges, Indianapolis permit rules, Indiana licensing notes, and what to expect from a well-run project in the city.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Indianapolis kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 kitchen remodeling companies in Indianapolis, IN

The 10 Indianapolis kitchen remodeling companies with the most Google reviews.

  1. 1

    Bath & Cabinet Experts

    4.8782 reviews4011 Vincennes Rd, Indianapolis, IN 46268, USA

    View on Google
  2. 2

    Chateau Kitchens & Home Remodeling

    4.9320 reviews301 E Carmel Dr, Carmel, IN 46032, USA

    View on Google
  3. 3

    Fairchild Renovations

    4.9134 reviews3185 Shadeland Ave, Indianapolis, IN 46226, USA

    View on Google
  4. 4

    The Heartland Builders

    4.9133 reviews8345 Clearvista Pl Ste 100, Indianapolis, IN 46256, USA

    View on Google
  5. 5

    Booher Remodeling Company

    4.8115 reviews5840 W 71st St, Indianapolis, IN 46278, USA

    View on Google
  6. 6

    Worthington Design & Remodeling

    4.7114 reviews99 E Carmel Dr Ste 100, Carmel, IN 46032, USA

    View on Google
  7. 7

    Nicholas Design Build

    4.989 reviews12502 Promise Creek Ln #434, Fishers, IN 46038, USA

    View on Google
  8. 8

    Morgan Remodel LLC

    5.078 reviews1602 W Smith Valley Rd #4, Greenwood, IN 46142, USA

    View on Google
  9. 9

    AY Remodeling & Restoration LLC

    5.078 reviews14300 Whitworth Dr, Carmel, IN 46033, USA

    View on Google
  10. 10

    Everything Home

    4.976 reviews200 S Rangeline Rd Unit 107, Carmel, IN 46032, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Indianapolis kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every kitchen remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Indianapolis kitchen remodelers

  1. Step 1

    Tell Henry about your kitchen

    Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard kitchen remodelers in your Indianapolis-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What kitchen remodeling costs in Indianapolis

Cosmetic refresh (paint, hardware, fixtures, same layout)$6,000–$15,000 (estimate)
Mid-range remodel, same layout$20,000–$45,000 (estimate)
Upscale remodel with layout change$50,000–$100,000+ (estimate)
Cabinet refacing$5,000–$12,000 (estimate)
New cabinets (semi-custom to custom)$10,000–$35,000 (estimate)
Countertops — laminate$25–$45 per sq ft installed (estimate)
Countertops — quartz$60–$120 per sq ft installed (estimate)
Countertops — granite$50–$100 per sq ft installed (estimate)
Backsplash (tile, installed)$15–$35 per sq ft (estimate)

Ranges are general estimates gathered from homeowner-reported quotes in the Indianapolis area, not an offer or a quote for your project.

When to schedule kitchen remodeling in Indianapolis

Many Indianapolis homeowners schedule kitchen demolition for late fall or winter when contractor calendars are lighter than the spring-summer rush, which can shorten lead times. Humidity swings through Indiana's four seasons mean wood cabinetry and flooring should acclimate in the home before installation, and any exterior-adjacent work (like a window removed for a layout change) is easier to sequence outside the coldest stretch of January and February.

Permits and HOA rules

In Indianapolis and Marion County, permits are issued by the Department of Business and Neighborhood Services (BNS) through the indy.gov Residential Development Permits process. Cosmetic-only work, such as new countertops or cabinet replacement in the same footprint without moving plumbing, electrical, or gas, is generally permit-free. Kitchen remodels that add or relocate plumbing, add electrical circuits, modify gas lines, or remove or alter structural walls require separate trade permits (building/structural, electrical, plumbing, and gas as applicable), each pulled by the licensed contractor performing that work. Confirm current scope rules and any fees directly with BNS before starting work.

Licensing and insurance in Indiana

Indiana does not issue a statewide general contractor license; licensing for general remodeling work in Indianapolis is handled locally through BNS, which licenses contractors working in Marion County. Plumbing contractors are licensed at the state level through the Indiana Professional Licensing Agency, and electrical work in Indianapolis is performed under local licensing administered through BNS. Homeowners should ask any contractor for their BNS license and, for plumbing or gas work, their state plumbing license, and verify both directly with the issuing agency before signing a contract.

What drives kitchen remodel costs in Indianapolis

The single biggest cost swing in an Indianapolis kitchen remodel is whether the layout stays the same or changes. Keeping the sink, range, and refrigerator in their existing locations avoids relocating supply lines, drains, and gas piping, which keeps a project closer to the mid-range tier. Moving an island, adding a sink on a new wall, or relocating a gas range to a different run of cabinetry adds plumbing and gas work that typically requires permits from the city and pushes the budget toward the upscale end.

Older Indianapolis housing stock in neighborhoods like Irvington and Butler-Tarkington can add costs that newer homes don't face: original plaster walls, older electrical panels that may need a subpanel or added circuits for new appliances, and sometimes undersized gas lines that need upsizing when a new range or double oven is installed. A contractor who walks the space before quoting should flag these issues rather than discovering them mid-project.

Allowances and where the money actually goes

Most Indianapolis kitchen remodel quotes include cabinet, countertop, and appliance allowances as dollar figures rather than fixed brand selections, since final choices often happen after demolition when the homeowner can see finishes in person. Ask for allowances to be written into the contract as specific numbers, not vague phrases like 'standard grade,' so there's a clear baseline if you upgrade a selection.

Labor for demolition, cabinet installation, countertop templating and setting, plumbing reconnection, electrical work, and tile or flooring installation is usually the largest line item outside of cabinetry itself. Getting an itemized quote that separates labor from materials for each trade makes it easier to compare bids and to understand where a change order will add cost.

Lead times for cabinets and countertops

Semi-custom and custom cabinet orders commonly take anywhere from four to twelve weeks to arrive after a final design is approved, and that clock doesn't start until measurements and selections are locked in. Stock cabinets from a big-box supplier can be faster but may limit sizing options for an Indianapolis kitchen with non-standard dimensions, common in older homes with narrower galley layouts.

Countertop fabrication, especially for quartz or granite, requires a template appointment after cabinets are installed and set, then typically another one to three weeks for fabrication and installation. Homeowners planning around a holiday or event should build this sequencing into their timeline rather than assuming cabinets and counters can be installed back-to-back without a gap.

Cabinet refacing, new cabinets, and countertop choices

Cabinet refacing keeps the existing boxes and replaces doors, drawer fronts, and hardware with a matching veneer on the visible frames. It suits Indianapolis kitchens where the boxes are solid and the layout already works, and it avoids the long wait that comes with a full cabinet order.

New cabinets make sense when boxes are water-damaged, when the household wants an island or a different storage plan, or when the layout itself is changing. Ask each contractor to price cabinets as their own line item, separate from installation labor, so you can see what you are paying for materials versus the work.

Countertops carry one of the widest price spreads in the project. Laminate keeps costs down and installs quickly, while quartz and granite cost more per square foot and need a template visit after the cabinets are set. Price the backsplash separately too, since tile choice and pattern can move that number on their own.

Payment schedules and change orders

A written contract should spell out a milestone payment schedule tied to completed work, such as a deposit, a payment at demolition and rough-in completion, a payment at cabinet installation, and a final payment at completion and punch-list sign-off, rather than a single large upfront payment. Negotiate a schedule that keeps the contractor's incentive aligned with finishing the job.

Change orders — any addition or modification to the original scope, like upgrading a countertop material or adding a pot filler — should be documented in writing with the added cost and any schedule impact before the work happens, not settled verbally and added to a final invoice. This protects both the homeowner and the contractor if there's a dispute later.

Working with Indianapolis permit and licensing rules

Because Indianapolis BNS requires separate trade permits for plumbing, electrical, gas, and structural work, a well-run kitchen remodel will have the general contractor or project lead coordinating which licensed subcontractor pulls which permit, rather than leaving it to the homeowner to track. Ask upfront which permits the project needs based on your specific scope and who is responsible for pulling each one.

If a contractor tells you no permit is needed for a project that includes moving plumbing or gas lines, confirm that directly with BNS before proceeding. Skipping a required permit can create problems later when selling the home or filing an insurance claim tied to the work.

Areas Henry covers

Meridian-Kessler · Broad Ripple · Irvington · Butler-Tarkington · Fountain Square · Herron-Morton Place · Garfield Park · Mapleton-Fall Creek

Common questions

Do I need a permit to remodel my kitchen in Indianapolis?

It depends on scope. Cosmetic work like new countertops, cabinets, or paint in the same footprint generally doesn't require a permit. Moving plumbing, adding electrical circuits, modifying gas lines, or changing structural walls does require permits from Indianapolis BNS. Confirm your specific scope with BNS before starting.

Is there a state license for kitchen remodeling contractors in Indiana?

Indiana does not issue a statewide general contractor license. In Indianapolis and Marion County, general contractors are licensed locally through the Department of Business and Neighborhood Services. Plumbing contractors carry a separate state license through the Indiana Professional Licensing Agency.

How long does a mid-range kitchen remodel take in Indianapolis?

Once design and material selections are finalized, a mid-range same-layout remodel commonly takes several weeks to a few months from demolition to final punch-list, depending on cabinet and countertop lead times and whether permitted trade work is involved.

What's the cost difference between refacing cabinets and replacing them?

Cabinet refacing keeps the existing boxes and replaces doors, drawer fronts, and hardware, which costs less than new cabinetry but doesn't change the layout. New cabinets allow layout changes and different storage configurations but cost more and take longer to order and install.

Should I get multiple quotes before hiring a kitchen remodeler in Indianapolis?

Yes. Getting itemized, written quotes from a few local contractors lets you compare labor and material allowances line by line rather than comparing a single bottom-line number, and it gives you a baseline for spotting a quote that's unusually high pressure or vague on scope.

Nearby Indiana markets

Sources

Get Indianapolis kitchen remodeling estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Kitchen Quotes