Kitchen remodeling companies in Austin, TX

Austin homeowners remodeling a kitchen face a wide range of costs depending on whether they're refreshing cabinet finishes or moving plumbing and gas lines for a new layout. This hub covers what kitchen remodels typically cost around Austin, when the City of Austin requires a permit, and which state boards license the trades involved, so you can plan with real numbers instead of guesswork.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Austin kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 kitchen remodeling companies in Austin, TX

The 10 Austin kitchen remodeling companies with the most Google reviews.

  1. 1

    Together Design & Build

    5.0312 reviews6000 S Congress Ave #101, Austin, TX 78745, USA

    View on Google
  2. 2

    Prime Construction and Remodeling

    5.0205 reviews705 N Bluff Dr, Austin, TX 78745, USA

    View on Google
  3. 3

    LFM Construction & Remodeling

    4.9197 reviews2307 Thornton Rd #103, Austin, TX 78704, USA

    View on Google
  4. 4

    Teamwork Home Designs - General Contractor Austin

    5.0187 reviews8101 Cameron Rd Ste 107, Austin, TX 78754, USA

    View on Google
  5. 5

    THA Construction & Remodeling

    4.9154 reviews2021 Guadalupe St Ste 260, Austin, TX 78705, USA

    View on Google
  6. 6

    Austin Dream Remodeling Bathroom & Kitchen

    4.991 reviews2713 Bristol Dr #2, Austin, TX 78723, USA

    View on Google
  7. 7

    New Creations

    5.090 reviews11716 Big Trail, Austin, TX 78759, USA

    View on Google
  8. 8

    ATX Construction & Remodeling General Contractor Austin

    4.989 reviews7600 Chevy Chase Dr Bldg. 2, Suite 300, Austin, TX 78752, USA

    View on Google
  9. 9

    Kitchen Central

    4.787 reviews3010 W Anderson Ln. C, Austin, TX 78757, USA

    View on Google
  10. 10

    Austin Remodelers & Build

    5.080 reviews11900 Acorn Creek Trail, Austin, TX 78750, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local Austin kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every kitchen remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with Austin kitchen remodelers

  1. Step 1

    Tell Henry about your kitchen

    Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard kitchen remodelers in your Austin-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What kitchen remodeling costs in Austin

Cosmetic refresh (paint/refinish cabinets, new hardware, countertop swap)$8,000–$20,000 per kitchen, estimate
Mid-range remodel, same layout$30,000–$60,000 per kitchen, estimate
Upscale remodel with layout change$65,000–$150,000+ per kitchen, estimate
Cabinet refacing$6,000–$15,000 per kitchen, estimate
New cabinets (stock to semi-custom)$10,000–$35,000 per kitchen, estimate
Countertops - laminate$25–$45 per sq ft installed, estimate
Countertops - quartz$65–$120 per sq ft installed, estimate
Countertops - granite$50–$100 per sq ft installed, estimate
Backsplash tile install$15–$40 per sq ft installed, estimate

Ranges are general estimates gathered from homeowner-reported quotes in the Austin area, not an offer or a quote for your project.

When to schedule kitchen remodeling in Austin

Late fall through winter tends to be a slower season for Austin kitchen remodelers, which can mean shorter scheduling waits compared to spring and early summer when many homeowners start projects ahead of the warmer months. Cabinet and countertop lead times, not weather, are usually the bigger scheduling factor for a kitchen project since the work is almost entirely indoors.

Permits and HOA rules

In Austin, interior remodeling of a single-family home is reviewed by the city's Development Services Department (DSD), and a Building Permit is required for work such as relocating or adding plumbing, gas, or electrical circuits, removing or altering load-bearing walls, or changing the kitchen's footprint. DSD's Residential Plan Review division reviews these projects for compliance with the adopted International Residential Code and local amendments under the Land Development Code. A cosmetic refresh that only replaces cabinets, countertops, or finishes in place without moving plumbing, gas, or structural elements may fall under DSD's list of work exempt from permits, so homeowners should check DSD's "Do I Need a Permit?" tool or contact DSD before starting. Never assume a fee amount; DSD publishes current fee schedules on its own site and fees change over time.

Licensing and insurance in Texas

Texas does not issue a general contractor license at the state level, so there is no statewide license number to verify for the person managing the overall kitchen remodel. The trades most likely to be involved in a kitchen remodel are separately licensed: electrical work must be performed by someone licensed through the Texas Department of Licensing and Regulation (TDLR) under the Texas Electrical Safety and Licensing Act, and plumbing work must be performed by a plumber licensed through the Texas State Board of Plumbing Examiners (TSBPE). Homeowners can verify an individual's or company's license status directly on the TDLR and TSBPE websites before work begins. The City of Austin may also require its own trade permits and registered contractors for electrical and plumbing work performed under a building permit, separate from the state license itself.

What drives kitchen remodel costs in Austin

The biggest swing factor in any Austin kitchen remodel budget is whether the layout changes. Keeping the sink, stove, and refrigerator in their current locations avoids moving plumbing and gas lines, which keeps a mid-range remodel closer to the lower end of its range. Once a project calls for relocating a gas line for a range, moving a sink to an island, or shifting load-bearing walls to open up the space, both labor and permitting costs rise and the timeline extends.

Cabinet and countertop selections are the next largest line items. Stock cabinets from a big-box retailer cost far less than semi-custom or custom cabinetry, and material choice for countertops (laminate versus quartz versus granite) can shift that single category by thousands of dollars. Homeowners working with a fixed budget often get the most value by setting a firm cabinet and countertop allowance early and adjusting finishes, not footprint, to stay within it.

Allowances and what they mean for your quote

Many kitchen remodel quotes in Austin use allowances: a dollar amount budgeted for items like cabinet hardware, plumbing fixtures, lighting, or tile that the homeowner hasn't picked out yet when the contract is signed. An allowance isn't a guess buried in a lump sum; it should appear as its own line with a specific dollar figure, so homeowners can see exactly what happens to the total price if they choose a fixture or tile that costs more or less than the allowance.

Written allowances also protect both sides when it's time to true up the final bill. If a homeowner selects a faucet that costs $150 more than the plumbing fixture allowance, that difference should show up as a documented change, not a surprise on the final invoice.

Layout and plumbing moves as the main cost driver

Moving a sink, dishwasher, gas range, or refrigerator water line to a new location is consistently the single biggest driver of cost increases in a kitchen remodel, more than cabinet grade or countertop material. Relocating plumbing or gas typically means opening walls or flooring, rerouting lines, and in many cases triggering the point at which Austin's Development Services Department requires a permit and inspection.

Homeowners who want an open-concept kitchen that also involves removing a wall between the kitchen and an adjoining room should ask directly whether that wall is load-bearing before pricing is finalized, since structural changes add engineering review and often a longer permit timeline through DSD's Residential Plan Review.

Cabinet and countertop lead times

Semi-custom and custom cabinets commonly take several weeks to a few months to manufacture and ship after an order is placed, and that lead time is often the longest single item on a kitchen remodel schedule, longer than the installation itself. Homeowners should ask for a written lead-time estimate on cabinets before setting a target completion date, and expect that date to move if a cabinet style needs to be reordered.

Countertop fabrication also requires a template of the installed cabinets before cutting, which means the countertop can't be ordered until cabinets are set in place. Stacking those two lead times back-to-back, rather than assuming they happen in parallel, gives homeowners a more realistic overall timeline.

Milestone payments and change orders in writing

A written contract for an Austin kitchen remodel should break payment into milestones tied to completed work, such as a deposit, a payment at cabinet delivery or rough-in completion, and a final payment at substantial completion, rather than large payments due simply by date. Texas law limits what a residential contractor can require as an upfront deposit on certain types of improvement contracts, so homeowners should ask their contractor to explain how the payment schedule complies with that limit rather than accepting a large cash deposit requested informally.

Any change to the original scope, whether it's an upgraded faucet, an added outlet, or a layout tweak discovered once demolition starts, should be documented as a signed change order with its own price before the work proceeds. Verbal 'it'll just be a little extra' agreements are the most common source of kitchen remodel billing disputes.

Working with licensed trades on your project

Because Texas doesn't license general contractors at the state level, homeowners are relying on the contract itself, not a state license number, to define who is responsible for the kitchen project overall. That makes it worth asking a prospective contractor directly which licensed electrician and plumber they use, and confirming those individuals' license status with TDLR and the Texas State Board of Plumbing Examiners before work begins.

For a remodel that involves new circuits, a relocated gas line, or moved plumbing, confirm with the contractor who is pulling the City of Austin trade permits for that work and who will be present for DSD's inspections, since permits and inspections are what create a paper trail if something needs to be fixed later.

Areas Henry covers

Zilker · Travis Heights · Clarksville · Allandale · Rosedale · Mueller · Hyde Park · South Lamar · Barton Hills · Crestview

Common questions

Do I need a permit to remodel my kitchen in Austin?

It depends on scope. Austin's Development Services Department generally requires a Building Permit when a kitchen remodel involves relocating or adding plumbing, gas, or electrical circuits, or altering structural or load-bearing elements. A cosmetic update that replaces finishes in place without touching those systems may be exempt. Check DSD's permit tool or call DSD directly to confirm your specific project.

Is there a general contractor license I should check before hiring someone in Austin?

No. Texas does not issue a state general contractor license, so there's no state license number to verify for the person overseeing the remodel. The electrician and plumber working on the project should hold individual licenses through TDLR and the Texas State Board of Plumbing Examiners, which homeowners can verify directly.

What usually costs the most in an Austin kitchen remodel?

Moving plumbing or gas lines to change the kitchen layout is typically the biggest cost driver, followed by cabinet grade and countertop material. Keeping the existing layout and focusing budget on finishes keeps costs closer to the lower end of a mid-range remodel.

How long does a kitchen remodel take from start to finish in Austin?

Timelines vary widely, but cabinet and countertop lead times are often the longest stretch of the schedule, sometimes longer than the installation itself. Projects involving a permit and inspections through DSD also need that review time factored into the schedule.

Can my contractor ask for a large deposit upfront?

Texas law limits upfront deposits on certain residential contracts, so a very large cash deposit requested before any work starts is worth questioning. Ask how the payment schedule is structured around completed milestones and get it in writing.

Sources

Get Austin kitchen remodeling estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Kitchen Quotes