Kitchen remodeling companies in San Antonio, TX

Remodeling a kitchen in San Antonio means balancing older homes near downtown and Alamo Heights with newer builds out toward Stone Oak, and the right contractor for a 1940s bungalow isn't always the right one for a 2015 production-built house. This hub covers what kitchen remodels actually cost in the San Antonio metro, what the city's permit and registration rules require, and how to check a contractor before signing anything.

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local San Antonio kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

Top 10 kitchen remodeling companies in San Antonio, TX

The 10 San Antonio kitchen remodeling companies with the most Google reviews.

  1. 1

    Legacy Bath & Kitchen

    4.8312 reviews15705 San Pedro Ave, San Antonio, TX 78232, USA

    View on Google
  2. 2

    Shaw Company Remodeling

    4.6184 reviews14127 Jones Maltsberger Rd, San Antonio, TX 78247, USA

    View on Google
  3. 3

    Hillview Remodeling and Design, LLC

    4.8159 reviews16403 Hillview Pass Dr, San Antonio, TX 78247, USA

    View on Google
  4. 4

    San Antonio Remodeling & Handyman Services

    4.8155 reviews12500 San Pedro Ave Ste. 540, San Antonio, TX 78216, USA

    View on Google
  5. 5

    Total home solutions tx

    5.0111 reviewsHausman Executive Suites, 8131 W Hausman Rd, San Antonio, TX 78249, USA

    View on Google
  6. 6

    GMG Construction of South Texas

    4.8103 reviews5835 Callaghan Road, San Antonio, TX 78216, USA

    View on Google
  7. 7

    Herbert H. Construction

    4.9100 reviews5301 Bandera Rd, San Antonio, TX 78238, USA

    View on Google
  8. 8

    ALO General Contractor

    4.783 reviews6100 Bandera Rd #301, San Antonio, TX 78238, USA

    View on Google
  9. 9

    1st Rate Remodeling

    4.882 reviews401 Isom Rd Ste 310, San Antonio, TX 78216, USA

    View on Google
  10. 10

    San Antonio kitchen and bath llc

    4.968 reviews613 E Ashby Pl #1, San Antonio, TX 78212, USA

    View on Google

Ratings and reviews powered by Google

Skip the 10 phone calls.

Tell Henry about your project once and get up to 3 written estimates from local San Antonio kitchen remodeling companies.

Get 3 free estimates

Already have an estimate? Get a free second opinion

The Henry Standard

Every kitchen remodeler in our network agrees to three things.

Show up

Call back. Keep appointments. And if something changes, communicate it.

Quote honestly

Scope by area, allowances in dollars and a milestone payment schedule in writing — no vague lump sum.

Finish the work

Complete every item on the scope and clean up before calling it finished.

Nothing revolutionary. Just the way we believe doing business should still be done.

How Henry matches you with San Antonio kitchen remodelers

  1. Step 1

    Tell Henry about your kitchen

    Your ZIP, the kind of remodel (refresh, cabinets and counters, full gut) and a rough budget. Two minutes, four questions.

  2. Step 2

    Only three pros get it

    Only three Henry Standard kitchen remodelers in your San Antonio-area ZIP get your request — each has agreed to show up, quote honestly in writing, and finish the work.

  3. Step 3

    Compare up to three quotes

    You hear from three kitchen remodelers at most — never a list of twenty — and every estimate comes in writing. You pick, or pick nobody.

What kitchen remodeling costs in San Antonio

Cosmetic refresh (paint, hardware, same layout, no plumbing moves)$6,000–$15,000 (estimate)
Mid-range remodel, same layout$20,000–$45,000 (estimate)
Upscale remodel with layout change$50,000–$90,000+ (estimate)
Cabinet refacing$5,000–$12,000 (estimate)
New cabinets, mid-grade$8,000–$25,000 (estimate)
Countertops, laminate$25–$45 per sq ft installed (estimate)
Countertops, quartz or granite$55–$100 per sq ft installed (estimate)
Backsplash tile, installed$15–$35 per sq ft (estimate)

Ranges are general estimates gathered from homeowner-reported quotes in the San Antonio area, not an offer or a quote for your project.

When to schedule kitchen remodeling in San Antonio

San Antonio's long, hot building season means most remodelers can schedule work nearly year-round, but spring and early fall are the busiest booking windows as homeowners avoid running an open kitchen through the hottest summer stretch. Cabinet and countertop lead times often run 4–10 weeks depending on the material and whether cabinets are stock, semi-custom, or custom, so homeowners planning a remodel around the holidays should start sourcing materials by late summer.

Permits and HOA rules

The City of San Antonio Development Services Department (DSD) issues residential building permits, and a permit is typically required whenever a kitchen remodel involves structural changes, moved or new electrical circuits, new or relocated plumbing or gas lines, or removal of a load-bearing wall. Purely cosmetic work, such as painting cabinets or swapping countertops without changing plumbing or electrical, commonly falls under DSD's no-permit-required list, but homeowners should confirm scope-specific requirements with DSD before starting work since rules vary by the exact project. Homes inside a Neighborhood Conservation District or historic district overlay may face an added design or historic review, which matters for kitchens visible from the street in neighborhoods like King William or Monte Vista.

Licensing and insurance in Texas

Texas does not license general contractors at the state level, so there is no statewide general contractor license number to check for a kitchen remodeler. The City of San Antonio does require registration for certain residential work: a Home Improvement Contractor registration covers non-structural remodeling, conversions, and modernizations, while a Residential Building Contractor registration is required for remodeling that involves structural work, additions, or foundation repairs. Electrical and HVAC work must be performed by professionals licensed through the Texas Department of Licensing and Regulation, and plumbing by those licensed through the Texas State Board of Plumbing Examiners. Before signing a contract, ask whether the kitchen scope requires DSD's Home Improvement or Residential Building Contractor registration and confirm the contractor or their subcontractors hold current state trade licenses for any electrical, plumbing, or gas work.

What drives kitchen remodel costs in San Antonio

The single biggest cost driver in most San Antonio kitchen remodels is whether the layout stays the same or changes. A same-footprint remodel that reuses existing plumbing and electrical locations keeps labor costs predictable because the crew isn't opening walls or rerouting gas and water lines. Moving a sink, range, or dishwasher even a few feet can mean cutting into slab foundation or running new supply and drain lines, which is common in San Antonio's many slab-on-grade homes and adds real cost beyond materials.

Older homes in neighborhoods like Monte Vista and King William often carry original electrical panels or galvanized plumbing that need upgrades before a kitchen remodel can proceed safely, which is a cost that doesn't show up in a cabinet or countertop quote. Newer construction in areas like Stone Oak or the Dominion typically has more modern infrastructure, so the budget there leans more heavily toward cabinetry, countertops, and finish selections rather than hidden infrastructure work.

Cabinet and countertop selections swing the budget the most within any given tier. Stock cabinets with laminate counters and semi-custom cabinets with quartz counters can be tens of thousands of dollars apart for the same square footage, so homeowners should treat the cost table above as a starting point, not a quote, and get itemized numbers in writing from each contractor.

Allowances, change orders, and how quotes should be structured

A clear kitchen remodel quote should break out allowances as dollar amounts for cabinets, countertops, appliances, flooring, and fixtures, rather than bundling them into one lump sum. An allowance tells the homeowner exactly how much is budgeted for, say, countertops, so if a homeowner later chooses a more expensive slab, the cost difference is visible and agreed to rather than buried.

Change orders are where many remodels go over budget without the homeowner realizing it until the final invoice. Any change to the original scope, whether it's discovering rotted subfloor under old vinyl tile or deciding mid-project to add a pot filler, should be documented in writing with the added cost and timeline impact before the work proceeds, not described verbally and settled later.

Negotiate a milestone-based payment schedule directly with the contractor: a modest deposit to secure the project, then payments tied to completed stages such as demolition, rough plumbing and electrical, cabinet installation, and final punch list, rather than paying a large share upfront.

Lead times and scheduling around San Antonio's climate

Cabinets and countertops are usually the longest lead-time items in a kitchen remodel. Stock cabinets can arrive in one to two weeks, but semi-custom and custom cabinet orders commonly run six to ten weeks, and quartz or granite slabs need to be templated after cabinets are set, then fabricated and installed, adding another one to three weeks at the end of the project.

Because San Antonio summers push into the triple digits, most households prefer not to be without a working kitchen in July and August, which pushes bookings toward spring and fall. Busy contractors tend to book out several weeks to a couple of months during those peak seasons, so homeowners targeting a spring or fall completion should start getting quotes well ahead of time.

Demolition and rough-in work, including any new electrical or plumbing runs, typically happens early in the project timeline and should be scheduled with the understanding that Texas heat can also affect how long drywall, paint, and adhesives take to cure properly indoors without strong ventilation.

Working with San Antonio's permit and inspection process

For any kitchen remodel that involves structural changes, new electrical circuits, or relocated plumbing or gas lines, the contractor should pull the appropriate permits through San Antonio's Development Services Department before work begins. A reliable contractor will tell the homeowner up front which permits the project needs and will not suggest skipping them to save time or money.

After permitted work like rough electrical or plumbing is complete, the project typically needs an inspection before walls are closed up, so homeowners should expect the schedule to include inspection windows, not just continuous work days. Trying to rush past an inspection step can create real problems later if a buyer's inspector or future permit application turns up unpermitted work.

Homes in a historic district or Neighborhood Conservation District, such as parts of King William or Monte Vista, may face design review if the remodel affects anything visible from the exterior, like a window change tied to a kitchen expansion. It's worth checking with Development Services early if the home falls in one of these overlay areas.

Checking a kitchen remodeler before you sign

Since Texas doesn't license general contractors statewide, the homeowner's due diligence has to happen locally. Ask whether the contractor is registered with the City of San Antonio as a Home Improvement Contractor or Residential Building Contractor, depending on the scope, and ask to see proof of the liability insurance the city requires for that registration.

For any electrical, plumbing, or gas work in the kitchen, ask for the name and license number of the trade professional who will perform it and verify that license directly through the Texas Department of Licensing and Regulation or the Texas State Board of Plumbing Examiners rather than taking the contractor's word for it.

Henry's model is built around this kind of upfront accountability: three local pros get the same project request, each agrees to show up, quote honestly in writing, and finish the work, so homeowners can compare real, itemized bids side by side instead of guessing which contractor is being straight with them.

Areas Henry covers

Alamo Heights · Monte Vista · King William · Terrell Hills · Stone Oak · Castle Hills · Southtown · Dominion · Hollywood Park · Shavano Park

Common questions

Do I need a permit for a kitchen remodel in San Antonio?

It depends on scope. Structural changes, new or relocated electrical circuits, and new or moved plumbing or gas lines typically require a permit from San Antonio's Development Services Department. Purely cosmetic work like painting cabinets or swapping a countertop without touching plumbing or electrical is commonly exempt, but homeowners should confirm the specific scope with DSD before starting.

Is there a general contractor license I should check in Texas?

No. Texas does not license general contractors at the state level. The City of San Antonio does require contractors to register as a Home Improvement Contractor or Residential Building Contractor depending on the scope of work, and electricians and plumbers must hold state licenses through TDLR or the Texas State Board of Plumbing Examiners.

How long does a mid-range kitchen remodel take in San Antonio?

Timelines vary with scope, but cabinet and countertop lead times alone often run six to ten weeks for semi-custom orders, plus installation time. A same-layout mid-range remodel commonly takes a few weeks of active work once materials arrive, while layout changes that involve permitted structural, electrical, or plumbing work take longer because of inspection steps.

Why do kitchen remodel costs vary so much between quotes?

Quotes can differ widely based on whether the layout is changing, the cabinet and countertop materials specified, whether plumbing or gas lines are being moved, and how allowances are structured. Ask each contractor for an itemized breakdown rather than a single lump-sum number so you can compare apples to apples.

What should be in a kitchen remodel contract before I sign?

The contract should include itemized dollar allowances for cabinets, countertops, appliances, and fixtures, a milestone-based payment schedule tied to completed work stages, a written process for handling change orders, and confirmation of which permits the contractor will pull and which trade licenses apply to any electrical or plumbing work.

Sources

Get San Antonio kitchen remodeling estimates in writing.

Two minutes now beats guessing at a lump-sum quote. Free, no obligation, never more than three remodelers.

Get My Free Kitchen Quotes